Hello everybody,
I have a group of materials which are produced (discrete manufacturing) each week in the same sequence. So my production plan is constant every week.
At the moment, the orders are scheduled manually on the planning table but I would want to schedule them automatically.
I know I can introduce a sequence number or a priority number in the corresponding order once it is created, but I would need to assign always the same priority number (or sequence number) to a product. This is the way that I am trying to solve the issue.
Is there anyway that this can be achieved? Or this could be done in a different way?
Thank you all,
Regards