Hello Experts,
I have a requirement from client to do valuation and costing of FG and SFG materials according to batches.
Currently,In Material master price indicator is 'S' and Say Standard price is Rs. 995
E.g. I have a FG material A and it has two batches suppose B1 & B2.
Cost of Batch B1 = Rs.1000
Cost of Batch B2 = Rs.1100.
So when i will do costing it should Valuate the material according to specific batch ?
As per my understanding and testing, split valuation will work for it and the valuation category 'Automatic Batch' needs to be maintained in Accounting view 1.Price Indicator 'S' doesn't support split valuation so we need to change the price indicator to 'V' for FG/SFG materials in material master.
Case 1:
Suppose I have a FG order with 1 component and 3 activity types at that time the cost of batch A comes to Rs. 1000
After doing costing run with CK40N the price of the material gets updated to Rs.1000.
Case 2 :
When i will create the next order the cost of batch will be Rs.1000 only but suppose a material or some activity time will get added/increased so it will
ultimately increase the cost of batch say Rs.1100 but in that case the batch created has the value Rs 1000 only.
So in that case we need to run costing before every batch ???
Please suggest how we can do batch valuation and costing for each batch ??
Warm Regards,
Amit Sharma