Hello all,

 

If I execute the scheduling for a work center it assumes the setup status of the product that it has just been produced. If it is the first product that is going through that work center I need to define an initial state that I understand provides with the relationship introduced on the setup matrix the start time of that work center.

 

I would want to know how I can achieve that the work center with a setup status assigned loses it so next time a product goes through it, the scheduling has to consider the setup time for the initial setup status again instead of considering the setup time for the last setup status that it had.

 

Thanks you all in advance.

 