Block Stock consider during MRP Run and Stock availibility check

$
0
0

Dear All,

 

I am facing the stock availibility check , Sytem consider the Defective material which is Block in same storage location ,and system not generate the Planned order .

-Blocked Material stock 100, and requirement 100 then system not generate the planned. Client need the system generate planned order 100 , Because 100 material is defective.

I have configured the system scope of availibility , Block stock check remove , but problem is not solve.

 

Thanks

Rajesh Tiwari