MCPS - LIS update the last changes on the production order as TECO - Time zero

$
0
0

In our process we analyze the MCPS result to have some information system about result production in a certain periodo entry.

 

In this analyze is knowledge that when the orders are complete confirmed or defined status TECO the information of production order as process duration, time confirmed are all with value zero. This behavior seems be standard by SAP.

 

Anybody has idea about any solution to MCPS ?

Or a specific report that same after confirmed the order or with status TECO will be possible to have the original information about the quantities, time schedulled or time confirmed  by the production order?

 

Is possible to change this behavior ? at the production order or  MCPS / LIS tables?

 

 