Quantcast
Channel: SCN : All Content - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 1791

BOM data Migration with ECN

$
0
0

Hi Everybody,

 

I'm trying to migrate the BOM's data with the ECN reference, with an LSMW based on a record of transaction CS02.

 

The problem is that when I give in input to CS02 the change number and an alternative date for the ECN as valid from the date is automatically re-setted to the ECN's valid from header date.

 

Is there any way to make the system take the alternative date?

 

current customizing settings allow Alternative date selection (there's a flag in OS54, "Assign Alternative Dates" that is flagged) but I'm not getting the selection pop up window if I put only the ECN without the date, and honestly I don't think I can manage this window in a record for an LSMW.

 

Do you have any suggestion to migrate BOM data with ECN (with the correct Alternative Date Assignment)?

 

Do you know if there's any way to manage a mass assignment of object to an ECN alternative date?

 

thanks a lot Guys

all the best

Pietro


Viewing all articles
Browse latest Browse all 1791

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>