Backflush at Line level for planned orders at Machine level

$
0
0

Scenario-

Planned Orders:  Created 2 orders(1000 cases each) at Machine Level, with Machine 1 at Line 1 and Machine 2 at Line 2. (Note: Both Machines and Lines are created as Production Versions)

Backflush: Consumption is done at Line 1(NOT machine Level) for 2500 cases together.

 

Results-

Planned Order at Line 2 also consumed up.

 

Required-

The Planned Order at Line 2 should not be consumed.

 

Analysis-

Checked the REM Profile, if I uncheck the last box for Plus planned Orders assigned to other versions, this will then not consume the PLOs created at the Machine level when backflushing at the Line level instead.

 