Hi Guru,
Can we seek your inputs on how we can be able to manage in SAP dual decision for a routing for a production Order? below is our scenarios.
We have a SAP Prod Ord, that was sent to Non SAP system (from this non SAP system the decision for the Prod Ord will be done).
We have for example 5 operation in Routing in Prod Ord.
Route Op 1
Route Op 2
Route Op 3
Route Op 4
Route Op 5
In the Non SAP system, we have two ways to produce the Prod Ord. This has two way to decide route operation for our production order.
1st. We need to skip Route 3, then just only have route 1, 2, 4 and 5 for the prod ord.
2nd. We need to skip Route 2, then just only have route 1, 3, 4 and 5 for the prod ord.
So now, our problem how can we manage in SAP this way we do in the non sap system? any customization or workaround we can do to manage the routing decision in SAP for this scenario? thanks.