Hi experts,
lets say I have operations of multiple orders dispatched in cm25 based on my available capacity. once I am done with this work, the next step is to print these orders in the right sequence that needs to be executed on shop floor. what transaction can I use to print them based on the start date of the operation?
I need to sort all the dispatched operations of the orders, starting with earliest operation to the last operation and then print them and provide them to shop floor supervisor