Dear Friends,
This is my requirement as below.
My client maintaine the Room temperature based on Batch shelflife.When the material recived user enter the batch time like 300 hr 200 hr depends on batch..... Once material stored with batch in the cold room. When ever he wants that materail user will take from that cold room and used some quantity and will be back put into cold room.
Once will take the material from cold room some activites done like cuutting ..This process will take 30 min or depends on quantity...So finally this time will reduced from that batch shelflife quantity automatically.
Once batch shelf life over remaining quantity will be moved to blocked.
Please tell me how to map in the sap.
Regards,
Manoj