Hi
We are using planned orders, and using MFBF carrying out the postings. We have control cycles set up, one of the components is WM managed and the requirement is to consume it from a specific storage type/bin with a WM movement.
In the control cycle for the component SKU, the WM storage type and bin and material staging 3 are assigned. We set up WM picking strategies against 261 movement to create a TR and a TO to pick the component from a WM bin to 914-Dynamic storage bin.
However, when we do the posting, the component is consumed from the Stype/Bin in the control cycle, with no WM movement. The quantity is simply updated in the bin and the material document WM data shows the WM movement type with Stype/Bin from the control cycle. No TR/TO created.
If I remove the stype/bin from the control cycle, then the desired WM picking to 914 works ok. I want to keep the stype/bin in the control cycle, because this is controlling which batch/qty to post depending on what is in this bin, but at the same time I want to achieve the WM picking movement to 914.
Any idea how to achieve this?