Dear all,
Please i have this Business requirement, thanks a lot for your help :
Production order quantity to be produced = 8000 kg
The routing had 3 operations, let's say :
Operation 1
Operation 2
Operation 3
I would like to have in SAP (at confirmation, or in production order), these information :
Operation 1: required quantity is 8200 kg
Operation 2: required quantity is 8180 kg
Operation 3: required quantity is 8050 kg
so that i can have my 8000 kg at the end.
Could we perform that through scrap data ?
Best regards,