Dynamic rounding Calculation.
Hi, for Dynamic Rounding Profile, i got the following example from SCN. ExamplesA material's base unit of measure is 1 unit; the purchase order is to be delivered in layers (1 layer corresponds to 5...
View ArticleSAP SCN Web User Guide
Hi, I'm new to the scn with following doubts: 1. How to send direct message to a member ? What is Prerequisite and how to do that ?2. I want to get notification on particular members posting....
View ArticleIndicator for document reversal
Hi , A goods receipt document is created . This document is reversed for some reason.After the reversal does the original goods document has any indicator to show it has been reversed ? The reversed...
View ArticleHow to change basic unit of measurement in material master mmo2
Hi Experts I want to change basic unit of measurement for material . since material does not have any transnational data it is not having any bom or routing . I have tried in mass also but not...
View ArticleMTO - REM but FI settlement at product cost collector
Lets say I use MTO - REM process. can Finance still do their period settlement using product cost collectors and not settle at sales order level? can we even achieve that? or is it hard coded that if I...
View ArticleProduction order type determination for strategy 82
All, We know that for strategy 82, one can have PO directly created and hence linked to the Sales Order.Understand that checking control needs to be set up for the plant , order type combination. A.]...
View ArticlePartial Settlement of Production Orders?
Dear Experts, Please can you share with me your knowledge on production order settlement? I am relatively new to PP configuration. I have a scenario from the business where they want to partial settle...
View ArticleMD04-Requirement Quantity
Business require logic of requirement quantity of structured header material should be calculate on the basis of its component highest requirement quantityFor this, we have implemented BADI_DECISION...
View ArticlePlanned Order finish date takes more time for higher Quantity sale order
HIWe are having an issue for a specific material.The problem is that when we create a sale order for 20k or 30 K the finish date of planned order comes after 2 years but when we are using sale order of...
View ArticlePIR Vs CIR
Hi Team, I am creating forecasts (ie, PIR) in MD61. The PIR will be generated for a material, plant, requirements type, version & planning horizon. In t.code MD81 (Customer indepependent...
View ArticleBackflush batch managed components to Serial FG - REM
Hi Experts, we are using REM and our FG is serialized (and not batch managed). we have a requirement to trace what components went to this serial number. While I do MFBF, if I mention batch number for...
View ArticleAdditional field AUFNR is not updated in copy of LIS table S225
Dear Experts, I am trying to create new LIS table for repetitive manufacturing as a copy of standard one S225. The only difference is additional column AUFNR - Order. My case is as follows: I created...
View ArticleMaterial allocation not possible for this order type
Hi PP Gurus, We have a material with dummy BOM ie., only header maintained no BOM items. Material has routings and all the configuration settings are in place.Material is FERT and In house production....
View ArticleReassign deleted material in released order-MD04
Dear Experts, I've deleted a material(item 0020) in released production order (MD04 component overview).But I need to reassign it to same production order.Are there any method to do it? Please help me?
View ArticleHelp with Planning Using Phantoms
All, My business is a complex sheet metal manufacturing cell with around 1600 live materials passing through at any one time and is currently set up as MRP driven. Due to this it is dificult to create...
View ArticleCO11N - The Goods Movements screen does not propose the 101 movements for the...
Hi folks, I hope you are doing great. I am facing some issues with co-product automatic goods receipt, I have a production order with the components: The operation has the control key with Automatic...
View ArticleProduction order without reference
Hi Friends, Can we get a report were we can know that how many production order are created without reference to planned order.We know how to find out through co02 but we want to check out for multiple...
View ArticleBill of material change component issue
Dear Experts, We are facing issue in BOM change with change number. We replaced A,B,C with X,Y,Z in the BOM with a change number with valid from date in 2016. But the system showing the requirement...
View ArticleCO13 with error for not enough stock (QM involved)
Hi all, Please guide me with this issue, I have PP with QM activated for a Fini Material, by error PP confirmed wrong quantity into CO11N, then QM gave Usage Decision with same error, then we did...
View Articleautomatic sale order number assign in production order
My client is using strategy group 40 but MRP requirement comes only from sales order because they do not prepare material without sale order. now i need sale order number in production order for some...
View Article