Probleam CO01
Hi Gurus, When you create a production order (CO01), and press enter, the system makes a check through the functions by first CS_ALT_SELECT_COUPLED_PRODUCT and soon after CS_WHERE_USED_MAT. Already...
View ArticleMFBF - Field for Employee ID
How can I add a field in MFBF for Employee ID and use that field to populate "Personnel number" in AFRU-PERNR without maintaining a HR Record. (i.e) Don't want to maintain SAP-HR records, however...
View ArticleProduction order co-product
Hi Gurus, I wonder if it is possible to open a production order of a co-product.?If it is possible that the proper way to do this? The co-product is not being consumed by the order but being generated...
View ArticleNo PIR but Planned order generated
Hi Team, There is a issue raised from one of my client. i.e, no PIR for the month of Jan, but the Production order has been created against the Planned order. My initial analysis for above issue is:...
View ArticleRejection of sales order line item with a assembly order
We have a sales order line item for which a assembly order has been created. We have a externally procured component in the assembly order for which Purchase order is created and GR is done. Invoice is...
View ArticleProduction is confirmation in Pieces and customer required weight as...
Customer Requirements: Production should be confirm in pieces which are weighted on scale . Desire pieces should carry weight along its attributes Attributes are ColorLength
View ArticleMFBF - Shift and Personnel number
I don't see the Shift (SCHIV) and Personnel number ( PERNR)as standard field in MFBF. I need to get these fields in a POP - UP SCREEN in MFBF, so that the operator can enter it in MFBF. How can I do...
View ArticleMF41- There are inconsistencies in the postprocessing records RM857
We are getting an "Error" when we try to reverse a material document through MF41 (REM). ERROR- There are inconsistencies in the postprocessing records (RM857)
View ArticleWant to change valid to date in BOM component uning change number
Hi, I have a BOM with 3 components 10,20,30 with valid from date as 01/01/2015 to 31/12/9999 now i want to change the valid to date of the 10 line item, is it possible? Now i want to change the valid...
View ArticleOld SubReq's Shown in MD04 & considered for Planning as well (No Preq found)
Hi, We are using AFS solution & have an issue in hand. For the component materials, planners are complaining that there is lot more quantity being planned that needed & which is supposedly...
View ArticleHow to delete records in COFC
Hi I am getting error "unprocessed future change records for order prevent delflag/completion' while process order close. I could see that entries in COFC transaction.When I double click on process...
View ArticleHow to split Planned order created in month for different requirement plan...
Hi Experts, I need assistance in configartion the the scenario where user creates 2 demand say for qty 10 and 10 each for month March under 2 different requirement plan for one material using...
View ArticleAt Order release
Hi, When iam creating processorder using t code cor1 ,in process order I entered the order quantity as 100kg.here my question is when ever iam entering the quantity order will be carried out ,where...
View ArticlePlan cost in production order
Hi Recently I have noticed the following- I have created production order and selected Plan Cost at the time of saving production order. While checking the plan cost system have calculated plan cost of...
View ArticleCross-Plant planning
Hello All, Am having a scenario wherein a product X is planned in plant 1400, material X is having components X1, X2, X3 & X4, X1 & X2 are subassemblies, X3 & X4 are raw materials....
View ArticleAuto batch determination for sales order stock
Hi Guys, I have a requirement for make to order scenario where component batch should be selected automatically during order release and correct batch will be the same sales order batch. Taking one...
View ArticleOptimum Lot size for production
Hi Guys, I have one requirement similar to minimum lot size, but having the small difference. If I put Min lot size as 60 and requirement is 55 system creates order for 60. The requirement is not to...
View ArticleFactory calender issue
We have assigned same factory calender (assigned one holiday calender ) to 2 plant for 7 day. but still in one plant its showing 7 days in MF50 while in other its showing only 6 days. what may be the...
View ArticleLot size key must link to planning calendar
Hi Team,While saving the material i am not able to save that and instead of that below message is displaying." Lot size key Z9 must link to planning calendar 002", please let me know in this issue....
View ArticleCRP Basic Settings Part 2 – Routing
This document has been migrated to the WIKICRP: Basic Routing Settings for Capacity Planning - ERP Manufacturing (PP) - SCN Wiki CRP: Basic Routing Settings for Capacity Planning After the creation of...