reverse using CO13
Hello guru, I am currently using discrete manufacturing scenario. and in that process i am producing jigs without BOM and ROUTING. i have made a dafault operation with work center using OPJG and i...
View ArticleXsteps through BDC or BAPI
Dear Experts, we are implementing Xsteps for one of our client.there are huge number of PI sheets we need to create.Please share if you have done this xsteps creation through BDC or do we have any...
View ArticleRelease of order not possible: CO118
Hello Experts, While trying to release order by COR1, user is unable to release the order.Attached is the screen shot. I checked all the possible configurations but still unable to find it outPlease...
View ArticleSAP VC - Material Variant indicator in Material Master
Dear Team, I would to remove the below indicator in material master (refer attachment). How to remove it? Could anyone guide me on the steps for the same? Thanks
View ArticleInsert Structure in CY39
Dear Guru, How I can insert structure from table AFPO into CY39. Thank you
View ArticleMIGO_GO transaction discrepancy
Hello Experts, I have one issue while doing a goods receipt for an process order.My process order is for Plant"X"(header of the process order) but while doing GR for the process order(101) the system...
View ArticleNot able to close order.
Hi Team The orders are in TECO status, while tries to close the orders getting below error. Br, Kiran U
View ArticleStock in MCHB Table, Not in MMBE
Hello experts, As observed for material with certain batch stock in lying in QA location in table MCBH,but it cannot seen in MMBE. when I am tracing for that i have found that it has been dispatched...
View ArticleSummary stock requirement list
Hello,My client likes report MCBZ (stock requirement list), it gives all the information they need however this report is not a real time I have to update the record by using transaction code MCB&....
View ArticlePlanned orders numbers skipped
Hi I have situation where planned order numbers got skipped and iam getting message Number range 01 for object PLAF nearly exhausted Please see attachment
View ArticleProduct Groups
Hello All, I just wanted to check with you to see if the following scenario is possible in SAP. For example If I have a product group and have multiple materials with different plants in it, Can I...
View ArticleWrong quantity appeared in planned order
Dear Experts, In t-code MD11, while user trying to create a planned order, under header tab he put 420 DP as order quantity. But after saving the planned order, the quantity changed as 2520 DP...
View ArticleMD63 - MD04 shows the duplicated forecast plan for the same week 52/2016
Hello, I have an issue on the demand duplication on MD04 / MD63 for the particular week on a material x for plant y The week 12/27/2016 / 12/26/2016 on IndReq for VSF on qty 153 nos each is being...
View ArticleBAPI / FM to Change Control Key In Production Order Operation
Hi Exports,Does someone have experence on change production order operation control key via BAPI or FM?I have tried BAPI as below but no...
View ArticleCollective order partial confirm
Hi PP experts, As I know, if child order is not complete confirm and we could not do confirmation for the parent order. How can I achieve below requirement: Parent order qty: 3 PCChild order qty: 3...
View ArticleDifference between Planning Strategy 40 & 70
Hello Team, I am investigating the difference between the below planning strategies 40 - Planning with final assembly ( Falls into MTS category) 70 - Planning at assembly level (Falls into MTO...
View ArticleCan we increase number of rows in production order confirmation-goods...
Dear Experts, Please tell me how to increase number of rows in production order confirmation-goods movement screen. Regards,Mukesh
View ArticleTask list does not Exist error-In Production version details
Hi,Find below image,Kindly let me know what i supposed to correct in this production version
View ArticleOperation User Status in Production order
Hello Experts, We need to change a new user status in some operations of our production order, we have seen that in the moment the production order is created, the value for the OBJNR of the operation...
View ArticleUOM changed during process order confirmation
Dear Expert, We have a semi-finished material, for which, in BOM the UOM is DP. When we create a process order against this material the quantity shows in DP. But when we're going to confirm the...
View Article