101 Mov. Co-products only, not principal product

$
0
0

Hello,

 

 

Please your help I need to make a Good Receipt movement of a production order, which has a co-products, the problem  appears  because I need that SAP only shows the coproducts in the MIGO, not the list of the co-products and the principal material.

 

 

 

BOM.jpg

 

When I make the MIGO - material Mov 101

 

2.png

 

Thanks,

 

MP


Manual printing for a Production Order Type ?

$
0
0

Dear Seniors,

 

We have currently 4 production order types in our system.

 

When the order is released, the order is printed automatically.

 

We want one of the Order Types to be printed only manually

 

Do you know where to configure that ?

 

Many thanks,

PR generated from MRP run exceeded maximum lot size

$
0
0

Hi gurus,

 

Need some guidance on the scenario below :

 

MRP run for material A

MRP type : VB

Lot size: EX

Maximum Lot Size : 200

 

Material A is a component of material Z. From a previous planned order of material Z, the requirement quantity of material A is 5000.

 

Now, after the MRP run for material A was done, a PR was generated with quantity of 5000.

 

My question is why was the PR generated with the requirement quantity of 5000 and not only did not obey the maximum lot size but exceeded it as well?

 

Thanks.

Lost of the info structure S026

$
0
0

The last week some people created a transport for transaction COR4 and we lost the information of the table s026, we need restructure this information again.

 

 

We lost the information of the last 3 years, only we have the new movements of consumption.

 

 

How we can rebuild this table (S026)?

Planned order in planning table

$
0
0

Hi GURU,

my requirement is to how i know the planned order of material for quantity because when i create a plan order of a material for

a particular date with quantity of 100 and suppose i confirm using mfbf only 50 so the planned order decrease with remaining quantity 50.

when i go to table PLAF is also show 50 quantity against that planned order.

please suggest me to how i know i much quantity"s planned order i created please suggest me any table, badi, bapi, or functional module

so i can develops a z reports as per my client requirment.

I created in cs01 bom 2 but when creating bom2 selection pop up am not getting please help me how to rectify it

$
0
0

I created in cs01 bom 2 but when creating bom2 selection pop up am not getting please help me how to rectify it

Hi experts can you please tell me what is the difference means strategy and LSF VSF functions

$
0
0

Hi experts can you please tell me what is the difference means strategy and LSF VSF functions

MRP RUN after chane of plan figure automically

$
0
0

Dear Expert ,

 

Our organization is a nature of process industry and production plan are changing frequently , as result every time we need modify PIR and then we have perform MRP RUN through t-code MD02 . This is very tedious to end user .

 

Hence we want to develop a tool , after  changes of plan figure , at the end day , from PBIM and PBED combination,  MRP RUN will run will perform atomically.

 

Please help me how to do the configuration .

 

Regards,

Amit Biswas  


SAP PP/WM Kanban cycle

$
0
0

Hello experts -

     I want to know when we create control cycle using LPK1 transaction and fill in the kanban fields it is not appearing on kanban board

could you please clarify whether the same kanban board can be used for control cycles created using LPK1 or will it only support for materials

created with PK01 control cycle.

 

Look forward for answers....

scheduling in the past

$
0
0

Dear Expert ;

 

I want to allow the scheduling in the past only in LTP.

 

I maintain scheduling type as backward 365 days ( in OPU5) on my scenario but it does not work .

so I add start in the past in "  paramter for determining the basic dates" it work in my scenario and also in the real time ?

I just want this option in LTP .

any help?

Bill of material change component issue

$
0
0

Dear Experts,

 

 

We are facing issue in BOM change with change number.

 

 

We replaced A,B,C with X,Y,Z in the BOM with a change number with valid

from date in 2016.

 

 

But the system showing the requirement of X,Y,Z in current date,

that is in 2015.

 

 

Also it is showing the requirement of A,B,C also.

 

 

We need only A,B,C requirment only which is present in the current BOM

and not X,Y,Z which is valid from 2016.

 

 

We noticed that, two change numbers with same valid from date, used to change  X,Y,Z

with INN and IND status.

 

 

Please explain, how to remove the requirement of X,Y,Z from the system.

 

 

Thanks in advance.

 

Regards,

Suresh.

Table Name

$
0
0

Hi Gurus  ,

We  have few BOM ‘s & after that created the routing  & assigned all the components to the routing operation , it was  showing entry in table ”PLMZ”  correctly  & then after we   deleted the BOM line item & recreated the same & then we found that  BOM’S assignment  to the routing has been removed .

We Checked  the table “PLMZ” but  its still  showing the same entries & not reflecting  in this table  .

Can we have any table which shows the BOM’S whose assignment has been removed  from the routing operation  ?

 

Thanks ,

Regards,

Aman

Waste handling

$
0
0

Hi,

 

We have a process were waste are generated during the production process but are not measurable at each production order level.

Waste are accumulated at one place and after one week stock are brought in system through 501 mvt and then one special production order is created which have recursive BOM and material good receipt and good issue is carried out at confirmation.

 

Please confirm whether their is some other alternative for this process. As using 501 mvt is very risky.

 

Regards,

Sun

Collective Order : multiple orders for same product

$
0
0

Dear all,

 

here is the situation I met in my company :

 

My production ordrers are defined in a collective order model.

 

A consums B

B consums C and D

C consums D

 

When I create an order, here is the result

 

Order for A

      Order for B

               Order for C

                      Order for D

                Order for D

 

In reality, we would like to get only one order in my collective Order model for product D.

Is there a way to ask SAP to  creeate only 1 order by product, Inside a collective order ?

 

Thansk for your help

 

Pierre

Error "12018" "Enter Date of Production" during "Cancellation of production order confirmation"

$
0
0

Hello All,

I am trying to cancel production order confirmation by using T code CO13.

It is showing error 12018 in Goods movement, "Enter Date of Production".

The material is batch managed, the date of production in production order & in the batch for the material is same.

Shelf life Exp. date is two years ahead.

What is wrong??????


BAPI For Process order confirmation COR6

$
0
0

Hi All,

 

Can you Pl let us know the BAPI for Process order confirmation which are done by COR6.

 

Requirement is,  we want to Partial confirm the Process order with Goods Movement as 261 ( Goods Issue For components)

 

Currently I am using FM-  BAPI_PROCORDCONF_CREATE_HDR.

After executing this FM , it is giving me message as Process order confirmed but actually No Goods movement is posted and PCNF status is not marked.

 

Can you Pl suggest if any step/ data is missing.

 

Thanks in advance.

 

Regards,

Sachin

MD4C excel report

$
0
0

hi,

we have MD4C report where we want to download the output of that report

with few fields.

Problem here is that it displays/downloads all the fields of which few

we do not need. So when we checked the layout it displays a default

layout.

 

Now is it possible that we can create a layout for the fields which we

need. Because we tried but its not giving the output as needed.

 

Please assist.

 

Thanks & Regards,

Nikhil

load / requirement not display in new hierarchy

$
0
0

Hi

 

we have created a new hierarchy: but when we run CM01 to display the load / capacity , the load is not display

 

the load is display for the hierarchy earlier in the past ..but since several weeks one a new Work center hierarchy is created there is no more load display in CM01

 

the setting in the general / setting is correctly set up ( cumulation of requirement is checked)

 

i don't see the reason why the load s not display anymore in new hierarchy when the load can still be display in the old hierarchy

 

Thanks you

 

 

Laurent VILA

Best planning strategy for my case?

$
0
0

Plant 1000 - Finished product A - this product sold only to customers

plant 2000 - Product B - this product is sold to customers and also to plant 1000

 

for product B we want to use MTO scenario (but we will plan components of product B) and for finished product A we want to use MTS scenario.

 

there will be STO's placed on plant 2000 from plant 1000 for product B. if I use MTO strategy for product B in 2000, how can I make the STO coming from plant 1000 behave like a sales order? what strategy shoudl I used for MTO product B...

Process order - Update Operation details like Quantity

$
0
0

Hello,

 

I am developing an application which will update the process order - operation details (like Quantity ).

Please suggest me a BAPI or FM which will update the operation information .

 

Thanks ,

Shaira .