Quantcast
Channel: SCN : All Content - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 1791

Cancelled confirmation yield GR considered for overdelivery tolerance

$
0
0

Hi Friends,

 

I have long back come across the scenario and not remembered why this is  happening.

 

I know OPK4 setting will control whether Yield+scrap+rework  is exceeding Order quantity, then system throws warning/error

 

But I am facing below issue,

 

I have order quantity 10,

 

1. 0010 operation confirmed with 10 yield

2. 0020 operation confirmed with 7 yield with final confrimation

 

3. 0030 operation confirmed with 7 partial confirmation.

 

4. Due to some reasons I cancelled confirmation for 0020 and 0030.

 

5. Again entered confirmation at 0020 for 7 yield with partial confirmation option. system allowed

 

6. where as 0030 operation which has Auto GR control key (delivered already seven 101 and reversed as above 102 mvt  type).  when I am again entered for 7 qty as confirmation yield system throws error as 4 qty exceeded to order quantity.

why system is not considering 102 mvt type in order to calculate Over delivery tolerance.

 

thanks

Nag


Viewing all articles
Browse latest Browse all 1791

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>