Script Recording & Playback for Dummies (intelligence)
In the previous document http://scn.sap.com/docs/DOC-57020we learnt how to create a simple script in order to execute steps automatically in SAP.Now, let´s introduce two new concepts to make this tool...
View ArticleShifts View in Planning Table MF50
Hi Thanks for your help.I would to view the 3 shifts we customized and assigned to the work center capaicity, at the planning table MF50 as 3 different columns per day.I have customized the REM planned...
View ArticleMRP elements (Requirements) for LTP
Hi All, Could you please let me know the MRP elements (Requirements only) that are considered for the long term planning? My requirement is that stock transport order (MRP element Ord.DS) should be...
View ArticlePIR reallocated on back orders V_V2
Were really struggling with an issue related to Planned independent requirements (PIR) consumption (MD61-VSF).We want PIR to be allocated/consumed based on the sales order request date (PIR...
View ArticleProduction Order affect in changing the BOM?
Hi Friends,Good Day...1. If i created a Production Order on 01-Feb-2015, whatever the BOM having the parent assy is as it is and in 03-Feb-2015 if i change an BOM in parent assy what will be the effect...
View ArticleIs it possible to schedule planned order individually by planned order number?
Hi Gurus, I have a problem with scheduling a huge bunch of tiny planned orders in a week and they are subjected to a lot of changes from time to time. The issue of the adjustment is that different...
View ArticleDaily Line wise , shift wise production plan
Dear Expert , We are of nature of process industries . We want to make configuration for production booking production line wise , shift wise daily . Presently production planning are made planning...
View Articlecreation or PO against receipt of SO
In MTO scenario we can create production order with reference to sales order, but we don't want to link between PO and SO. Because sometime business want to sell same process order stock to different...
View ArticleHow we can change the Effective parameter
Hi Gurus, How we can change the effective parameters of a standard variant (linked to ECM) for a existing production order which status is REL. Also I have a query how the standard variant is linked...
View ArticleMinimum BOM quantity
Hello, Is it possible to define a minimum quantity for a component in a BOM.For example a FG with components A, B, & C; for a base quantity of 1 pc for the FG we need:1xA, 1xB 3.5xCbut the...
View ArticleKANBAN BOARD PK13N Tabular Representation
hi All, When displaying the kanban board, how to choose between a tabular and a graphical representation.as per sap help " When displaying the kanban board, you can choose between a tabular and a...
View ArticleCancelled confirmation yield GR considered for overdelivery tolerance
Hi Friends, I have long back come across the scenario and not remembered why this is happening. I know OPK4 setting will control whether Yield+scrap+rework is exceeding Order quantity, then system...
View ArticlePieces are required at GR level along weight !
HelloFriends Please suggest me which is best option for me 1) weight to Pieces conversion2) Pieces to weight conversion3) Weight will be picked directly from Scale This scenario is Deseret...
View ArticleKanban replinishment by Production order
Hi Friends, I am working on KANBAN process, where the Source will production line when demand comes for higher assembly. below are my queries, 1. How the Production order will be created (planned order...
View ArticleIn MRP BOM should not explode but in planned order creation and costing BOM...
Dear all, I have requirement that BOM should not be exploded in MRP, but in costing run and Planned order BOM to be exploded.Please provide a solution for this requirement. Regards,Amar
View ArticleMRP List was not updated
Dear all,I did use a SA to transfer material plant to plant. But after good issue and good receipt, MRP list was not updated. So now, it exists in longtime. I don't know how to remove it.Please see the...
View ArticleNew product for existing product
Dear experts, Here is one of our client's requirement. All the Materials are been produced, sold and inventorized in CV's(Ex 1CV=100pcs). Now the requirement is that our client is dismantling the...
View ArticleMRP Run based on valuation type
Hi, My client requirement is to run MRP based on valuation types.There is a finished product with assemblies and components.For the finished product and assemblies there is no valuation type maintained...
View ArticleWhat does "P" in predecessing operation status means?
Hi, could anyone explain to me what the "P" in the predecessing operation status means? See screenshot below: Sincerly, Robert Forthun DamliProduction Planner Subsea Cables Energy Business /...
View ArticleConfirmation quantity is getting in Base unit of measure against operations...
Hi Sapients, In the routing for a material in the standard value tab , had maintained the conversion unit of measure.But the base unit of measure and operational unit of measure is KG only.I had...
View Article