Hi Experts
we have maintained Quota arrangement scenario as below
Material Details
Material : ROH
MRP Type: PD
Lot size :EX ( Splitting Quota is checked in Config.)
Quota arr. usage: 3
Purchase:
Vendor-V1 and Vendor-V2
Source List maintained with V1 and V2 for ROH with Validity 31.12.9999
Quota arr (MEQ1): V1 :V2 as 50% : 50%
Validity : 31.12.2020
Min. Lot size: 0
Rounding Prof : 2700 (1->2700)
MRP:
When I ran MRP maximum qty. is allotted to V1 and lesser Qty. to V2
Please help to understand which parameter is influencing the % allocation
Below threads were reviewd but no clue is identified
http://scn.sap.com/docs/DOC-52298
http://scn.sap.com/docs/DOC-51785
Request: Not to post generic answers and stick to the content
Thanks,
Anand