Quantcast
Channel: SCN : All Content - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 1791 articles
Browse latest View live

individual capacity update automatic

hai friends,      I have booked 4 individual labor capacity of one work center to particular prod order for next day. The next day one person not came client required automatic update on absence need...

View Article


Planned orders generated by MRP should be for the same requirement date

Hi All, Have a requirement with MRP in REM, to trigger planned orders as per the below Have requirements for 3 months like 50, 50 and 50 for each month.MRP created planned orders as per the...

View Article


Routing creation from MES

Hello All, We are planning to create routing from MES and it would be sent to ECC through middleware (SAP-PI). The question really is - What is best way to create it- idoc?- Webservice if...

View Article

BOM item - distribution key for dep. requirements qty distribution

Hi there,I am aware of the distribution key functionality for BOM item - basic data view, to be used to split dependent requirement for particular components either equally on daily basis or to the end...

View Article

Image may be NSFW.
Clik here to view.

navigation profiles for the MRP list and the stock/requirements list ( MD04)

We have created a new navigation profile for the MD04, with 9  General transaction calls, but in MD04 only 1st 5 general transactions are visible and can be navigated. Is there anyway we can navigate...

View Article


URGENT:UNABLE TO DO GOODS ISSUE IN MIGO

Hi present process order status is:REL  CRCR PRC  BCRQ MACM PIGN SETC *No  goods issue was done to the process order(materials were not yet processed) *No confirmations were done. *NO ERRORS IN COGI...

View Article

Image may be NSFW.
Clik here to view.

Material is blocked for single item planning error message in SM58 for...

Hi,I am getting one issue  related to MRP in SM58 for the  Functional Module  MRP_KD_AUFTRAG_RFC that " Material is blocked for single item planning. and the transaction code is showing is VA02(Sale...

View Article

Image may be NSFW.
Clik here to view.

To copy the component assignment

Good afternoon! Fast question: Is possible for the transactions CA01, CA02 and CEWB (or some other), to copy the component assignment to a material for the other? We need this for the two forms: 1) We...

View Article


MF60 - Production Order # is not appearing

Hi, When i try to execute MF60 by entering Production Order #, the component relevant for staging appears but the Production order is missing here. Please refer the attachment for more details. Request...

View Article


Production order confirmation cancellation

How can we delete the production order and its confirmation.production is done in co01 and confirmation in co15.now i want to cancel them.

View Article

Script Recording & Playback for Dummies (intelligence)

In the previous document Script Recording & Playback for Dummieswe learnt how to create a simple script in order to execute steps automatically in SAP.Now, let´s introduce two new concepts to make...

View Article

Run time abap error

Hi everybody, When I enter MD04 transaction code, after writing the material and plant getting the run time abap error. What would be the reason for this error? Thanks in advance.. Umut RUHI

View Article

Want us to change the INDUSTRY SECTOR in material master t code.

Hi Team,  User wants to change the INDUSTRY SECTOR for particular three materials in material master.From: Chemical IndustryTo: Food and Consumer Prods So please guide me if its possible to change? if...

View Article


Special procurement key 40?

Dear Gurus, Please guide me for working on special procurement key 40. What is this and how to do settings for it, please give steps to do it? What is the result of it and where to see this result?...

View Article

SLED is different in WM and batch record

Hi All, I have a issue where SLED is different between the WM , i.e in table LQUA and batch record. The flow of sequence is ,a new batch was created with movement type 309, in which a new SLED was...

View Article


Image may be NSFW.
Clik here to view.

SD-QM-PP issue regarding Reference Operation Set

Dear friends, As we know, it is possible to assign sales document in the routings/inspection plans/... But how we can take profit of this assignment ? On what it is useful please ?     It will be very...

View Article

routing group counter

Hi, Can we assign common group counter to common routing group.  Say for example if one material code A0001 has routing group as 50000001 with group counter as 1 and other material code A0002 has...

View Article


Image may be NSFW.
Clik here to view.

Variant Configuration

Hi Folks, I hope you are doing great. The material "988F-1.100.2160" is the variant and the material "988F-1.002.9951" is the configurable material. When the characteristics are like the image bellow,...

View Article

Image may be NSFW.
Clik here to view.

To copy the component assignment

Good afternoon! Fast question: Is possible for the transactions CA01, CA02 and CEWB (or some other), to copy the component assignment to a material for the other? We need this for the two forms: 1) We...

View Article

Image may be NSFW.
Clik here to view.

MRP-Quota splitting

Hi Experts we have maintained Quota arrangement scenario as below Material DetailsMaterial : ROHMRP Type: PDLot size :EX ( Splitting Quota is checked in Config.)Quota arr. usage: 3 Purchase:Vendor-V1...

View Article
Browsing all 1791 articles
Browse latest View live