Hi,
I am configuring flexible planning for my client. The requirement is simple, we have 5 levels of planning which is :
1. Sales org
2. Sales Office
3. Sales Group
4. Product Hierarchy
5. Material (SKU)
I created a new info structure and selected the above characteristics in my info structure. Also I am using two key figures which are "Sales" and "Production" as shown below :
Now When I am creating the planning hierarchy, system asks me to provide the value at the first four levels and keeping the last level which is "Material" non editable
Having said that, I am facing issue configuring the different values at the first 4 levels. Once I get into the transaction, system is asking me value only for materials not the other characteristics. But this is wrong as there are many possible combinations for the first four characteristics as well.
As per the above screen system is asking only the value for materials but I need to provide different values of the first four characteristics here with many possible combinations. As I am missing the "Next Level" button on the top where it is highlighted in yellow.
Please let me know if I ma missing some configuration.
Also Can I delete the planning hierarchy? I can delete the members but still can I delete the complete planning hierarchy and try to create a new one.
Thanks,
AK