Deficit of blocked stock xx kg in ud reversal

Dear Friends, I try to cancel the ud I getting the error like “Deficit of blocked stock xx kg xxxxx and xxxx.”Ex :20 qty production 15 stock moved to unrestricted and 5 qty moved to blocked stock.Then...

View Article


Import and launch capacity leveling data from a legacy system

Hi, We are facing a situation with our customer where I would need your help. This process is as follow: Sales orders are created in SAP.MPS is triggered manually, creating planned order with capacity...

View Article


Single planned order requirement of Semi-finished & that SFG is part of BOM...

Dear Experts, My client is producing goods on (Make to Order) based strategy. I have a Sale Order lets say 12345 for ABC customer and it contains 3 line items of Finished Goods material. Duvet Cover...

View Article

Factory calender

Dear all, I have created the special rule in factory calendar for the month of June 11th to 30th as holidays.But when i am running the MRP the system is generating the requirements on this mentioned...

View Article

Flllow-up material on MRP4

Please confirm if standard SAP allows for daisy chain of follow-up materials as requested by user.Is it possible to change the information message for Message no. MM031 to a hard stop message with an...

View Article


PIR is not consuming by sales order in strategy 40 with backward consumption

Hi Guru, I am using planning strategy 40 and I have given requirement by MD61 as given below, January=100 qty.  Feb= 200 qty,  March= 250 qty , April=300 qty , May=350 qty, after MRP run all PIR get...

View Article

Dismantling the production order

Hi all, Client is having the requirement that if suppose excess components are issued from warehouse to production or dismantling the production order the assigned batches for the components is picking...

View Article

Image may be NSFW.
Clik here to view.

MRP type X0 in HANA

Hello  , I am currently working with MRP integration between APO and SAP S/4HANA ON-PREMISE 1511  and in SAP S/4HANA ON-PREMISE 1511 the MRP type X0 is not an option in the material master  view MRP 1....

View Article


No order status if capacity is not checked in Production Order ?

Dear Seniors, In the production order, there is the option of capacity check.If the capacity is not available, we get the status MSCP. If the capacity is available or if the capacity has not been...

View Article


Image may be NSFW.
Clik here to view.

Planning levels in Planning Hierarchy for Flexible planning

Hi, I am configuring flexible planning for my client. The requirement is simple, we have 5 levels of planning which is : 1. Sales org2. Sales Office3. Sales Group4. Product Hierarchy5. Material (SKU) I...

View Article

Image may be NSFW.
Clik here to view.

Configure Planning hierarchy in Flexible planning

Hi, I am implementing flexible planning where i need to configure planning hierarchy. I have 5 characteristics in my planning hierarchy as shown below: 1) Sales Org2) Sales District3) Sales Office4)...

View Article

Unable to delete a material from a BOM

Hello All, I am trying to change the unit of measure of a material, but I get an error that it is assigned to a BOM so, I went to CS02 and I deleted it, but when I go to Cs03, I still see it, hence I...

View Article

Create new Key figures for Flexible planning

Hi, I am working on flexible planning for my client where I am using a self defined info structure where I copied some characteristics and key figure from the existing info structures.Now I need to...

View Article


Image may be NSFW.
Clik here to view.

Routing operations getting deleted

Hi Team,we are facing a strange issue and the issue is as follows, we are bridging the BOM through the matrix to SAP.After this we are creating the Routing through CA01 and assigning the operation to...

View Article

Production Order Change - New Batch Determination

Dear All, I have been facing doubts regarding production order change and new batch determination. Initial production order is created(CO01) and released having all qty of components automatically...

View Article


Material Consumed

Dear Members In my organization fabric is manufactured. I want to see how mauch material is consumed in a particular production order. From which tcode i can get my result

View Article

Image may be NSFW.
Clik here to view.

Auto GR on Multiple Operations in same Production Order

Dear Experts ,  My Scenario we have Auto GR on multiple Operations of same Production Order with Control key Auto GR flagged , this is achieveable .it works fine  So I am giving you our real live...

View Article


Jump from CO02 to Capacity Planning Table

Hello.  While I'm in Change Production Order CO02 I can follow the menu path GoTo \ Capacity Planning Table.  When I do so I am taken to the Capacity Planning Table but the standard overall profile...

View Article

Mandatory Standard Cost Estimate

Hi Gurus Is there a way to make the system check if the Product has a Standard Cost Estimate at the time of creation or on release of the production order?If the Standard Cost Estimate does not exist,...

View Article

Express Document Upload Termination Error during PP BOM Creation

Hi all,I'm Vinod Keerthy., a new one to this good community !Now here is my Question.,While Creating PP BOM., Error Showing "Express Document upload was terminated".Can anybody please tell me the...