Hello Frdz
please tell me step wise how i can create routing with multiple operations and assign sequence
i created routing with two operations but system is giving error at confirmation level . i think so i missed configuration/ something else
Error
Sequence 0 operation not found in order XXXX, check entry
please tell me steps & configurations
thanks