Batches
Hi, I want to change description of batch characteristic but when I change description it reflect in all earlier batches (Means for all earlier batches the description for that characteristic...
View ArticleHow to reduce PIR after delivery for sales order is created
Supply chain has loaded the demand as PIR, so after Procuring and inwarding, i created a sales order and w.r.t. Sales order, delivery is created, now i want as soon as delivery is created, the demand...
View ArticleMRP for inhouse & external procurement type materials
Hi, i have a one product which will produce in inhouse and produce in sub contraction. can i use one material code for both types using X special procurement key type. i wan to know how deliver plan...
View ArticleCapacity Utilization - Past report
Hi all, I need a SAP report in which past capacity utilization of the processed production orders can be accessed based on which we can plan the future capacity planning.I have already checked with...
View ArticleBOM creation for trading goods and consumption of child items without any...
Hi! All, We are dealing in trading goods, for which I have defined a BOM, to trigger planning for all the child components (e.g. packing items, warranty cards etc).We are not doing any production...
View ArticleEdit document date after save QA11
I am newbie to SAP please help me.i have saved QA11 then i realize that i have wrong entered doc date, is there anyway to edit that or cancel QA11 so i can correct document date?
View ArticlePast due delivery not showing as demand in MRP
Hi Gurus We have a STO delivery created from Plant A fulfilled for Plant B, the delivery is past due. In MRP it shows as demand in Plant A as long as it is current, when it becomes past due it doesnt...
View ArticleMD04-VSF
Hi TeamCurrently we receive forecast data to SAP from Third party non-SAP system, on Weekly basis for Material and Plant combination. SAP reads the details received from third party system and...
View ArticleTracability of production order from Invoice
Hello, Can somebody explain how we can trace back the production order reference from invoice no, two scenario 1. In JIT production environment, Multiple Production order are created and subsequent...
View ArticleLSMW upload for BOM header to item link
I am trying to create LSMW using direct output RCSBI010 for BOM but getting error Like below...."he following syntax error occurred in program "/1CADMC/SAP_LSMW_CONV_00000268" in include...
View ArticleRemoval of a sales order item related to a TECO'd works order
Hi, We use assembly orders ( works orders ) linked to sales orders . If a user wants to delete an item from such a sales order we get the following message:" You cannot select assembly...
View ArticleDismantle/Disassembly order
Good afternoon. Could I kindly ask you to provide me some guidance on how to create and handle a dismantle/disassembly order? I have red many posts here in SCN, which their process i have followed, but...
View ArticleCO11N - Wrong Posting Date passed to the Mat. Doc
Hi, We are having some trouble on confirmation while defining the Posting date as a past date in CO11N. In some of the Confirmations, when i check the confirmation detail in CO14, i see that posting...
View ArticleOrder Report ICON not visible for planned order in MD04
Hi! All, dependent requirements are not getting generated. eventhough i checked for settings in MRP4 view and MRP type for FG and child items. All are okay. When i am opening the planned order, it...
View Articlewhat is scheduling and floats?? (production order create)
while creating the production order its need to fill up the scheduling and floats. wants to know details about the scheduling and floats!!
View Articlemultiple operations to one routing
Hello Frdz please tell me step wise how i can create routing with multiple operations and assign sequence i created routing with two operations but system is giving error at confirmation level . i...
View ArticleMRP - Material Requirement Planning - Process Flow - Diagram
Dear All, Here I had explained the MRP - Material Requirement Planning - process flow -Diagram. Basically the MRP process can be run in two ways either through 1. External procurement and 2. In House...
View ArticleBOM Quantity Less than 1 for UOM of PC or EA
Hi Group, For manufactured materials, our UOM in the material master is KPC (Thousand Pieces). The base UOM in our BOMs is 1.000 KPC. Some of our components have a UOM of EA or PC. We manufacture...
View ArticleMD81 Process Steps - How to cosume stock
Hi Gurus,We want to use CIR ( MD81 ) for our client. As you know CIR is an alternative for Sales Order.But, what is the next step for CIR? For sales order we create Outbound delivery and PGI.We are not...
View Article