Hi,
We are having some trouble on confirmation while defining the Posting date as a past date in CO11N.
In some of the Confirmations, when i check the confirmation detail in CO14, i see that posting date is as the user entered the in the CO11N. But when i check the material document created by this confirmation, i see another posting date (Which is the actual date of the confirmation entry).
For more detail;
when i check the AFRU-BUDAT it is the Posting Date that users have entered in CO11N.
When i check MKPF-BUDAT with AFRU-WABLNR, i see another posting that which is equal to AFRU-ERSDA.
Any ideas ?