Hi,

 

We are having some trouble on confirmation while defining the Posting date as a past date in CO11N.

 

In some of the Confirmations, when i check the confirmation detail in CO14, i see that posting date is as the user entered the in the CO11N. But when i check the material document created by this confirmation, i see another posting date (Which is the actual date of the confirmation entry).

 

For more detail;

     when i check the AFRU-BUDAT it is the Posting Date  that users have entered in CO11N.

     When i check MKPF-BUDAT with AFRU-WABLNR, i see another posting that which is equal to AFRU-ERSDA.

 

Any ideas ?