CO11N - Wrong Posting Date passed to the Mat. Doc
Hi, We are having some trouble on confirmation while defining the Posting date as a past date in CO11N. In some of the Confirmations, when i check the confirmation detail in CO14, i see that posting...
View Articlemultiple operations to one routing
Hello Frdz please tell me step wise how i can create routing with multiple operations and assign sequence i created routing with two operations but system is giving error at confirmation level . i...
View ArticleValuation control in material master and special stock differs
Hi Gurus,I am getting an error in COGI after GI against a production order .The error is like "Valuation Control in material master special stock differs." Could you suggest how to overcome this...
View ArticleMachine ID on CO19 screen.
Hello SAP Experts, I have a question regarding the CO19 transaction. There is a field on the screen which says 'machine id'. I couldn't get any information using F1 help but I assume that this is...
View ArticleIs it possible for me to use the costing BOM (usage 6) for LTP scenarios?
My query regarding LTP scenario. Is it possible for me to use the costing BOM (usage 6) for LTP scenarios? I have tried to use BOM selection ID as 05(first priority to costing BOM) in Planning...
View ArticleLSMW upload for BOM header to item link
I am trying to create LSMW using direct output RCSBI010 for BOM but getting error Like below...."he following syntax error occurred in program "/1CADMC/SAP_LSMW_CONV_00000268" in include...
View ArticleError determining planning periods for Calender -MD04
Hi Experts,I recently(yesterday) changed factory calendar on client request as they had shut down for two weeks. After MRP run today morning when we are trying to go to a material its throwing error as...
View ArticleExcel could not be started - SAP Best practices
Hi Gurus, I am started to do sap best practices for PP , In KEPM --> Operating concern (US_20 - Best practices). When i double click the Planning method, It shows like Excel could be started. As i...
View ArticleMRP run
Hi,Our demand is from Sales order. After the MRP run, the Po will be issue for this product. After we get the product from the vendor we will do a good receipt, when the GR done the qty of the product...
View ArticleNPPs Consumption
Hi, Despite the MR3 parameters for consumption mode are mantained, the system don't do the consumption of the NPP when a sales order ir created. The requirement class is also correctly mantained. Is...
View ArticleTwo jobs run on one workcentre
Dear Frds Two jobs are executing on one work centre , that jobs are completed in one hour for instanceTwo jobs have been started 8:00 to 9:00 at one work centrehow i will confirm an individual job on...
View ArticlePlanned order scheduling & WC shift
Hi Gurus, i'm facing an issue about scheduling and work center shift.Factory calendar is set as 5 working days (mon-fri).On a particular WC i set as standard shift the following (same working...
View ArticleVENDOR MASTER
DEAR SIR IN VENDOR MASTER WE ARE USING T CODE XK01, AND OTHER T CODE FOR VENDOR MASTER YOU CAN TELL ME.THANKS JITENDRA
View ArticleInconsistency between AFFW and RESB
Dear Experts, I had a problem with COGI when i am trying to clear COGI entry system gives me a following dump. Error AnalysisShort text of error message :Inconsistency of postprocessing records...
View ArticlePP-CRP: What topic in Capacity Leveling would you like to increase your...
Capacity Requirements Planning is one of the topics more discussed on this space because of the complex customizing and master data settings.Therefore, we would like to know your opinion about which...
View ArticleWM Material staging - production order
Hi Experts, Need your help on WM Material staging for production order. Currently we had EHP7 upgrade on our system. Then we found out that there is an error during WM Material staging. The supply area...
View ArticleCombining sales order as 1 single planned order
Hello Members I am having 2 sales order of 100 pcs and 50 pcs with same requirement date.I am using strategy 20 and lot sizing MB and avl chk-01.As per my understanding if we use MB then requirements...
View ArticleAutomatic goods receipt of rework order
Hello All, Scenario is like this:I have created a rework order and in the operation, I have assigned the control key which is having 'Automatic goods receipt' indicator marked. Now, when I am...
View ArticleMFBF CONFIRMATION ...SCRAP & YIELD
Hi, During mfbf confirmation, i want to confirm both at same time i.e. yield & scrap. i am not able to do both at same time. second, scrap material should go to scrap storage location . please...
View ArticleREM Confirmation
Hi Gurus, During REM confirmation(MFBF), i have selected the planned order. after clicking the post with correctin i cant see any BOM items in that screen. What is the problem, Kindly give me some...
View Article