SAP MRP settings for my requirement

$
0
0

Hi,

 

We are changing a plants MRP type from PD to Reorder point with external requirements within the lead time(ZZ).The only thing I want the new MRP type ZZ to do is to calculate how much to procure based on re-order point level, receipts/requirements and DO NOT consider Forecast to come up with a proposal as checked in OMDQ within the lead time.

 

ZZ New MRP Type:

MRP_1.png

 

Also, the current plant is live using PD as MRP type with the following settings,

 

Current PD MRP type settings:

MRP_2.png

 

My concern here is what should be my settings on my ZZ reorder point MRP type so that VSF reductions are not affected and it should work the same way as we are doing today, Sales order that are currently being put into this existing live plant is not being affected and must consume forecast as the same way. I am sure I do not want to consider forecast to plan in re-order point.


Thanks