Capacity split & operation scheduling

Hello gurus,i'm facing the following problem:- i have set in a WC for the scheduled capacity type 001 two single capacity (16 * 2 = 32 h)- using co02 (or cm25), i split the order in the two single...

View Article


Batch Split Incorrectly?

I have a problem with Batch Split. Current inventory for raw material A: BatchQuantity000000000120 KG000000000230 KG An order that requires 40 KG of material A was created and released.Under normal...

View Article


MDVP issue - availability check

Hi all Here's my problem. I am using the MDVP transaction for availability check. But for some reason, when SAP shows me the missing parts and I check the stocks, I find that there is stock in the...

View Article

MDVP - Collective Availability Check

Hi every body: I need your help, using transaction MDVP, because it doesn´t work when I am trying to use with ATP Check. I don´t really know if there are missing a customizing. Can any one give me an...

View Article

Highest priority of Backflush Indicator

Dear SAP Gurus, 1. If I activate backflush indicator in Material master, Workcenter, Routing and Production order. Then which backflush indicator the system will choose for automatic backfushing and...

View Article


Image may be NSFW.
Clik here to view.

ms64

Dear expert ; I have many versions for the same material    when i tried to copy version 4 to version 1 qty is not duplicated but a new line with version no 01 is duplicated ?try to change the qty from...

View Article

Consumption against process order

hello all gurus,I need to set validation control in process order to consume all the materials based on BOM. There can be a 5% +/ - tolerance on consumption and there should be no major variations on...

View Article

COOISPI Report Mismatch

hello sir,requesting to all sap gurus,help me out. COOISPI is not showing all the withdrawn quantity while I am taking the component wise report. If the materials are issued in multiple batches i could...

View Article


Fixed Lot size with splitting but without rounding value as multiple

Hi all,I have a requirement where business wants a particular size of lot in planned order.The scenario is when customer order drops in for part A for say 2500 EA, after MRP run the total amount/fixed...

View Article


Automatic Moving of Expired item to scrap storage location ( 23916 )

hello sap gurus, when i maintaining material shelf life period in Material Master. i Would like to move those FG items which are expired to scrap storage location automatically. i can even schedule a...

View Article

MRP issue for Spares Material with Reorder point and FX lot size

Hi PP Gurus, I have issue in MRP for Spares Material where no PR's are generated after MRP BG Job run. Client wants to run the MRP via BG Job only and not ready to use MD03 or any Manual...

View Article

Goods Receipt in Production Plant.

Dear Experts I Have an requirement like as followsWe are having two Plants. Let us consider 1000 - Production Plant and 2000 - Planning Plant. When we are doing GR, stock is getting increased in...

View Article

Reducing Forecast Requirements

Good evening. I need your help in order to understand the issue of the forecast requirements reduction. Although I have searched and i have read from various resources, I am still not confident enough...

View Article


DOUBT MATERIAL CONSUMPTION OF ALTERNATE BOM

DOUBT IS IN ALTERNATE BOM RAW MATERIAL CONSUMPTIONSFG1RM1-MAIN BOMRM2-ALT BOM SAP QTY IN PLANTRM1-30 KGRM2-100 KG WHEN IT IS GONE FOR PRODUCTION SFG 1 IT SHOULD CONSUME RAW MATERIAL 40 KG EITHER RM1 OR...

View Article

Planned delivery time is not taken into consideration when creating PR

Good afternoon. I am running an MTS scenario, where i am using EX as lot size and PD as MRP type. When i run MRP for my material,MRP creates one Purchase requisition per day (grouping daily reqs, as it...

View Article


Production order creation Issue

hello sirsap gurus,SAP should not allow Planned order to Production order creation if BOM or Rouitng is not present for the material code.

View Article

current date scheduling is picking a future date in production order

Hi, When I choose current date scheduling type during production order creation, after scheduling it is adjusted to a future date i.e. If basic start date: 09/09/2015then after scheduling it is...

View Article


Firming Indicator (*) for Scheduling Agreements not consistent between MD04...

Hello SAP Gurus, We are seeing a certain behavior in the system where a Scheduling Agreement is MD04 marked with firm indicator *, but in MD05 it is not.  Observations:1. These SAs are within the Firm...

View Article

Image may be NSFW.
Clik here to view.

SAP MRP settings for my requirement

Hi,  We are changing a plants MRP type from PD to Reorder point with external requirements within the lead time(ZZ).The only thing I want the new MRP type ZZ to do is to calculate how much to procure...

View Article

Availabilty check for the production order

Hi, I have a scenario on the availability check for the components on the production order. It is basically a MTO scenario: Header Material:3011000010 Converting planned order to production order....