Dear .. ,
I have a routing with 2 operations.
Now I want a check when operation 1 is finished, but the goods should only be booked after operation 2 is finished.
I am using control keys PP01 for operation 1 and PP03 for operation 2 but the system still makes goods movement after checking operation 1 in CO11N.
Anyone who can help me with this?
Regards