Automatic MRP to run for CBP when stock falls below reorder point

Hello Experts, We have manual reorder point planning(VB) for one of our clients,But there is a requirement which wants MRP to run in background for the material whose stock falls below Reorder...

View Article


Applying Safety Stock formula in SAP - Is it possible?

Hi Folks, I need your precious advice as I am new to this area.  I am trying implement dynamic safety stock in SAP ERP system. I have checked the ‘Range of Coverage Profile’ option. But the parameters...

View Article


Image may be NSFW.
Clik here to view.

How to activate Services for Object (GOS) in MSC2N.

Hi Friends, I would like to know how can we activate services for Object (GOS) in MSC2N t.code where i can attach the documents and maintain the privatenote/text.Can we achieve through standard...

View Article

WPDTC Tcode-authorization

Hi all.I want to know the authorization checks in place for WPDTC tcode. I have a basic idea about the tcode. Our business wants to use it. Hence we need to know the checks in place because, there are...

View Article

Create Routing Groups using BAPI_ROUTING_CREATE Limitation?

Hi all, I am doing a conversion for the routing groups for PP. The routing groups include sequence, operation number, material assigned and component allocation. In this project, the BOM size of the...

View Article


Alternate Tcodes...

Hi, For the following functions can anybody share alternate Tcode with "4 CHAR". S_ALR_87007513DEFINE LOCATIONS_ALR_87000416ASSIGN PLANT PARAMETER TO INVENTORY MANAGEMENTS_AL0_96000757CHANGE MESSAGE...

View Article

transaction screen variants

Dear all, I have created transaction screen variants using T-code: SHD0 for CO02 as ZCO02N ,because  End user are keep on  tempering Production order qty in component overview screen (CO02). To aviod...

View Article

Image may be NSFW.
Clik here to view.

No activity type has been specified in row 1

Hello Friends - I'm am FICO area and I'm getting this error, while doing confirmation in MFBF. I have 3 Work centers and confirmed activities in the first two successfully and got an issue, while doing...

View Article


Lime Stone Manufacturing Process in SAP

Dear Experts  Can any one share his me the Process-es which are mapped for Lime Stone Manufacturing Plant in SAP-PP. (From Manufacturing Point of view -- PP Processes involved. Regard'sTallha

View Article


Additional Cost on Material

Dear All, We are procuring a raw material(a) from Supplier & making some sfg material(b) from this by producing inhouse ,Now This material b will be sent to Subcontracting for job work through 57f4...

View Article

Image may be NSFW.
Clik here to view.

Batch Determination in Process Order

hi, i want to do batch determination using alternate UOM while system is doing in base UOM.kindly suggest how can i change the display unit of measure to B (i.e. display in unit of entry). regards,sk 

View Article

SAP PP Certified Fresher

Hello, i am recently (Aug-15) SAP PP certify from Atos Guragaon.I also having 5 yrs domain exp in production planning (MRP II) .Anyone help me how  i make entry as a consultant and what will be start...

View Article

Confused in MRP strategy

Dear All, I am little bit confused in deciding which MRP strategy (10 or 40) should be used for the below mentioned scenario. client is receiving three months rolling sales plan from the customer next...

View Article


SOP Planning Calculation in Percentage

Dear Gurus, 1. Please suggest what characteristic I should choose so that system give me the % sign in UOM column. 2. secondly is there any pre define formula to calculate the percentage value; like, I...

View Article

Image may be NSFW.
Clik here to view.

CM01- Capacity Planning overview

Dear All, In CM01, capacity requirements are not visible as shown below. Even though there is a production order on 01.01.2016.Capacity requirements are not shown in the Capacity Planning overview. In...

View Article


CO11N

Dear .. , I have a routing with 2 operations.Now I want a check when operation 1 is finished, but the goods should only be booked after operation 2 is finished.I am using control keys PP01 for...

View Article

when will customer stock get update in MD04 ?

Dear Experts,while checking stock of a particular material in MD04 , one MRP element Customer stock is there , but it showing stock as 0. can any one explain when that customer stock will update ?

View Article


Useful books for studying Production Planning

I have already seen many threads on this space asking for books to study production planning, therefore, I have decided to share here the books that I consider more relevant on this area. Starting with...

View Article

Planned Order Planned Opening Date Calculation

Hi Experts, I have come across with a situation that how Planned Opening Date calculation happening in Planned order if Inhouse production time is not maintained.  As I have faced a situation where I...

View Article

Scrap process in REM

We have a scenario where during machining it became  scrap because of original Casting defect at source(Vendor). How do we handle the return to vendor process.Because in MFBF, if you use component...

View Article