Based on work center exclude activity cost / include activity cost during costing run

$
0
0

Dear All,

 

1.0) There are two activity type, Activity  type A & Activity type B.

 

2.0) Created stranded value key.

 

3.0) create new formula for costing which not activate the check box for cost.Please find the attached screen shot.

 

4.0) My Requirement:-

 

4.1) Activity A is relevant only production & business did not capture the cost during costing run & in production order for work center XYZ.

 

4.2) Activity A (Same activity) relevant to production & business want captured the cost during costing run & also cost captured in production order with work center ABC.

 

4.3) For above point 4.1 i have created costing formula which is not activated the tick for cost & same formula i have assigned in work center - XYZ in costing tab.

 

But when i have run the costing system calculate the cost for activity A during costing run.

 

How can i exclude the activity cost (Activity A) during costing run for one work center & same activity (Activity A) also consider the cost for another work center.

 

Regards,

Vaibhav Kurde