Dear AllI trying to configure  Xsteps in my plant here, but the table CMX_XS_VM_XNS is populated with the data. Even you save the request with the values. Anyone has idea whtat's going on? Thanks in...

View Article


Image may be NSFW.
Clik here to view.

Purchase Requisition in place of Planned Order

Hi I have an issue with an MRP Run.I have two Materials (say:X,Y).Both the materials are same and not even a single field is having the difference. MRP Type: V1 When i run MRP in MD01/MDBT the...

View Article


Production quantities produced

Hi All, Is there any transaction or table from where i can get  quantity of compound produced per type of compound/month. We are using REM scenario.

View Article

Image may be NSFW.
Clik here to view.

MRP Planning Extra Materials With User Exit

Hello Experts,I am working on reorder point planning in which consumables materials with MRP type VB and MRP controller say 'MNT' which is maintained for all 3 Plants say 1100,1200,1300. In Plants 1100...

View Article

SOP Actual Sales - Actual Sales Last Year

Dear Gurus, in mcb8 i have choose the above characteristics, and same is coming blank as an output in the planning table.  when i have posted the sales in sap lets say in month dec, 2015 and when open...

View Article


Planning Type - Planing Start

Dear Gurus,  for the planning start option for the planning type i have the following scenario, where looking for hte gurus feedback. 1. i am sitting in dec, 2015 and wants to enter the plan in sop...

View Article

SOP Mass Change

Dear Gurus, Is there any option for the mass change against a value in key figure in a specific version. lets say i have a version 001, where i have 10 sales organization and ten materials, plan is set...

View Article

MC-94 Internal session terminated with a runtime error COMPUTE_BCD_OVERFLOW

Dear Gurus, I have maintain a plan for a (sales organization and material) are characteristics for a 12 month period, with the planning type Z001 and in version 001.now i have to incorporate the plan...

View Article


Based on work center exclude activity cost / include activity cost during...

Dear All, 1.0) There are two activity type, Activity  type A & Activity type B. 2.0) Created stranded value key. 3.0) create new formula for costing which not activate the check box for cost.Please...

View Article


Material has MRP type ND but still sales order does ATP eventhough there is...

Material has MRP type ND (no planning)assigned and there is no stock in system but if we create sales order then system still confirm sales order qty. Do you know what could be the reason? Thanks.

View Article

Lot size "EX"-Lot for lot order quantity

Hi..I face that when setting lot size in material master is "EX". Normally, SAP should generate plan order follow the quantity of each requirement. But I faced that if some requirements fall in to the...

View Article

Process Order Error

Hi Experts, When trying to add a phase to the process order getting the following error. This is strange as so many order orders we added and only one order displays this message as attached screen ....

View Article

ask : Assembly scrap and expected yield variance

Is there anybody can help me regarding assembly scrap andexpected yield variance?I have an issue with total quantity of production order, for example I create production order for part A with assembly...

View Article


MRP Based on MRP Group

Hi Experts With the help of SCN i found how to run MRP with MRP group. We have two MRP group 0001 for BOM Material and 0002 for Non BOM material. There is two variant one is for daily MRP run and...

View Article

Xsteps

Dear AllI trying to configure  Xsteps in my plant here, but the table CMX_XS_VM_XNS is populated with the data. Even you save the request with the values. Anyone has idea whtat's going on? Thanks in...

View Article


Image may be NSFW.
Clik here to view.

CM01 capacity requirement only calculating for 1 planned order not others.

Hi Experts, I am facing issue in CM01 related to calculation of requirement hours against the planned orders. I enter PIR in weekly format for one month & run mrp with lead time scheduling, it...

View Article

Overpick on TO causing problems on PI Sheet

Our system is set up with WM/PP interface with TR for material staging to PSA created at process order release. Batch determination happens at conversion to TO.  All of our materials are set up as pick...

View Article


no planned order created

Dear Team  I have upload some new items that have PIR in plant 1 and will be produced in plant 2 , I maintain the special procurment key as other old material have the same case, now when running the...

View Article

PI Sheets....!!

Hello Experts,I have a requirement from  Pharma client to implement PI sheets,I am working from last few days on it and trying to build up concept of this functionality provided by SAP.I have already...

View Article

while performing MIGO print is not comming at the required output printer

Hi, Requirement the Though the default printer is set as LOCL(Say default printer as X), Print has to happen automatically at the required specific output device (say Y) when ever user does the goods...