Hi All,
I have a raw material in a plant having "VB" reorder point planning , HB as the lot size. (Replenish to maximum stock level).
I already have a PR and Purchase order in future date after 6 months from now.
When I run MRP the system is not considering the PO and It raises planned order
I have maintained Planned delivery time as 30 days.
My requirement is when I run mrp system should consider my future PO and It shouldn't create any Planned Order. Is there any settings required to obtain the scenario.
Thanks,
YUVI