SOP Flexible Planning client requirements
Hi Friends, I have a requirement where my client is having different trading units called BU (business unit). The S&OP to have sales past data at BU level and there will be two BUs will have past...
View ArticleHi folks, just heard that as per the emergence of SAP HANA, the functional...
Hi folks, just heard that as per the emergence of SAP HANA, the functional consultants job would be cut down. is it true
View ArticleProduction version selection based on certain conditions
Hi all, Our FG is configurable material, one material can run on 5 machine with different characteristics values. Based on sales order characteristics, machine run time changes which we achieved by...
View ArticleWM material staging
I am creating a Production order thru CO01. I release the order,then i create the WM pull list from the GOTO option at the top.The BOM material is shown,but the BOM qty is not populated . I have...
View ArticleProblem in conversion of Planned orders to production orders
Hi Experts,While converting planned orders to production orders through T code COHV,it is giving an error that Configuration for instance 000000000001260561 was not found. Please guide me how to solve...
View ArticleQty. not updated in the original order after confirmation of rework order
Dear all. Te scenario is as below: There are 5 operations in the routing for material A. Raw material is R. There are no material codes in between. Each operation has the control key for milestone...
View ArticleScrap confirmation in Rework Operation
Hello Everyone We are following the below process flow. - Operations are confirmed for yield & rework quantities in the operations.- Once the rework quantity is confirmed, Rework operations are...
View ArticleProduction order printout not in sequence of production number instead print...
Hello PP Experts , On Unicode upgrade we are receiving issue related to Production order printout not following the sequence of production number instead its printing according to sequence of...
View ArticleDump ERROR-Collective Order
HI experts, I faced a very strange incident, the collective parent production order 102387635 has something wrong, and it can’t display the sub-level production orders.So user want to TECO this...
View Articlerework order confirmation
Hi,experts Original production order confirmation trigger point the rework production order (without material).When i confirm the rework order,and in FCOST i confirm the yield ,the production order...
View ArticleCOOIS report
Dear All, How can utilize COOIS report, Please explain all reports comming through COOIS report. Please Name the reports and explain procedure.......
View ArticleMessage number for "No valid BOm exist for material xxx"
Dear All,We are using ECN for creating and change number. Sometimes we observe that BOM is created but same not being approved in System.In this case Production is posted without BOM.Screen shot is...
View Articleplanned order not getting converted into notional production order (FBDD type...
dear sir i could not able to convert planned order into notional production order as the item is direct despatch item should be despatched from stores without any shop work. attached error...
View ArticleBatch Determination
Hi All, Can anyone please tell me what all stock types (Unrestricted, restricted etc.) are considered during batch determination for component material in Process order? (Or if there is any settings or...
View ArticleMRP ISSUE
Hi All, I have a raw material in a plant having "VB" reorder point planning , HB as the lot size. (Replenish to maximum stock level).I already have a PR and Purchase order in future date after 6...
View ArticleGoods Movement Issue
Hello experts, We have an issue with a process order 7000148145 which is already in confirmed status.But the goods movement display of the process order does not show the 101 movement for the header...
View ArticleWrong Issued Value Quantity In MCRE Report
Dear PP Gurus, As per below screen shots wrong values display in MCRE/MCRX Report I have Check all movement types in MB51 but Values are not match Also Check OMOD, Material Price & Required...
View ArticleAutomatic updation of BOM in Production order
Hi Experts, I have runned MRP on 01.12.2015 and planned order is created on the same day. I have changed the production BOM on 10.12.2015.I have converted the planned order which is generated on...
View ArticleExternal production order
Dear PP gurus, Could you please help me to find out a solution to manage the following scenario through Standard : I want to track a subcontractor activity without using the standard subcontracting...
View ArticleControl Recipe
Unable to create control Recipe. Following Error message is there in error log. 1)No values assigned to char. 0020 PPPI_INSTRUCTION in process instruction 0000 phase 10102)No text found for...
View Article