Hi Friends,
I am trying out a scenario to produce an FG with both REM and discrete based on the lot size.
I maintained the rem allowed for the PRod version with defined lot size limits.
I am able to get planned orders of type PE and LA as per lot size.
Problem is for LA order the Conversion allowed indicator is not ticked by default.
I have already checked the BOM status(it allowed in planned orders), strategy is 10.
what am I missing? If the REm profile in the MRP4 View is considered then what is the use of REM ALLOWED check in PRod version?
Regards,
Max