Copy Company Code -- master data for PP

Dear SAP Team, My Business needs to create a new company code (eg ZA00) They need to transfer all the master data  from one existing company code (eg YA00)  to new company code (eg ZA00)  From PP/QM/PM...

View Article


Barcode Integration For Goods Issue, Goods Reciept and delivery Process in...

Hi Friends, We want to use barcode integration with the following processes - Barcode created for batch material.During the goods receipt the stores clerk scans the barcode and it fetches all the...

View Article


function module for getting the basic and scheduling dates in process order.

Hi, Is there any function module or BAPI which can give the process order calculated dates(i.e. basic and scheduled dates)? we got an requirement to build a SAP custom report which will take material,...

View Article

Target cost and actual cost

Hi, I need to know the cost updating in production order goto------ cost --------analysis.From where the cost is getting updated?I have analysed the activity type calculation and material price...

View Article

How to find the info structure used for a material

Hi experts,My previous project created a planning hierarchy for a material. Now I know the material code, but when I want to find the planning hierarchy in MC63, system asks to enter the Info...

View Article


Image may be NSFW.
Clik here to view.

How to make the termination message visible in MD05?

Hi Guru, Would you please hint me on how to make the termination message visible in MD05, please? The screenshot below is copied from SCN. Thank you so much, Sally

View Article

CO_BT_ORDER_DET_TEMP

Hi all,I need to write report to change VGWxx values for operations in production orders. I try to do it via FM CO_SE_PRODORD_OPR_CHANGE. But there is problem, I everytime recieve exception from FM...

View Article

Production order scheduling

Hi everyone When creating production orders the system is taking routing in consideration to calculate the start date.Is there any way to setup SAP so all the operations in the routing use the same...

View Article


Planned orders without checking material availability

Hi, can any one explain MRP throw the planned orders without checking material availability? Tks.

View Article


Additional field at position level for Manual Reservation ?

Dear Seniors,  We have the business scenario in which we can create additional Manual Reservation for missing components in Production Order (PRO). Then, we have a report in which we link the manual...

View Article

Image may be NSFW.
Clik here to view.

Serial Number Duplicacy for same material during MFBF

Dear Gurus,  As per above screen shot for mov. type 131 in both documents 20 same serial numbers are used on same date So how it is possible to used same serial numbers again?? We have check Log in...

View Article

Image may be NSFW.
Clik here to view.

Production order - Classification

Hello all, I have encounter a little problem when I want to create a production order. I have material "A" that is produced in-house. When I create the production Orders and when I release the order it...

View Article

discrete and REM together

    Hi Friends, I am trying out a scenario to produce an FG with both REM and discrete based on the lot size. I maintained the rem allowed for the PRod version with defined lot size limits. I am able...

View Article


Yield zero through CO11N But Confirmed with CO11

Dear           When i confirm operation 10 Of milestone through CO11N it always confirm yield "zero" then again we need to confirm through co11.What may be the reason.Please suggest . For reference i...

View Article

Sales Forecast Coefficient and SIOP

Hi Experts,What is the use of Sales Forecast Coefficient ZP26 and why do we maintain sales forecast in ZP27. For SIOP we create product group in MC84.Is it the same as creating Product hierarchy? If...

View Article


Image may be NSFW.
Clik here to view.

planned independent requirement reduction with sale order.

hi team, pls suggest Material -FERTstartegy- MRP group- 40.consumption indicator-1 MD61 Plnd Ind.Req. are entered for march (15), april (30),may (35)now if  through MRP requirements are generated for...

View Article

Batch management for a BOM component.

How to assign a batch to a batch managed BOM component in BOM list to book the material from a particular storage location and from a particular batch? Storage location option is available but the...

View Article


Print via Output Control

Hello. We confirm production using tr. CORK with automatical goods receipt (movement type 101).After that we need to print document using tr. MB90. But we can not do this.If we look to this document in...

View Article

Cross-Object ATP Check PP/SD - truly a SAP limitation?

Dear gurus, I am reporting here one of the most "frequently asked questions" i received during my past client experiences, and would like everyone to contribute bringing their own experiences on the...

View Article

Image may be NSFW.
Clik here to view.

False "Recursive BOM Component possible" message in MD04

Hi all. This is our scenario: - plant A needs to produce an assembly (ZFER - finished product) with ad indented BOM including assemblies of ZFGR type (Functional groups) and assemblies of ZSUB type...