planned independent requirement reduction with sale order.

$
0
0

hi team,

 

pls suggest

 

Material -FERT

startegy- MRP group- 40.

consumption indicator-1

 

MD61 Plnd Ind.Req. are entered for march (15), april (30),may (35)

now if  through MRP requirements are generated for say march(20)

 

In MD04 how can this plnd. ind req. to be reduced as in march we have generated req. of 20.

would like to have an auto reduction in demand whichever SO /STO been input into system.

once the STO/ SO in system, it will automatically remove from the forecast to avoid double demand.

will input forecast (MD61) on monthly basis. But, the demand will trigger material planning once new SO / STO input into system.

The SO/ STO will be on daily basis.

 