MD07 for material MRP type VV

Dear SAP experts, We are assesing MRP type VV (forecast based planning). We have run the forecast and got the data like this: 01.12.2015 --> 5 pcs01.01.2016 --> 10 pcs01.02.2016 --> 8 pcsetc...

View Article


Missing E1AFSER knot for serial numbers in LOIPRO03

Hi Experts, I want to send Serial numbers from ERP to ME via LOIPRO03 Idoc. Unfortunately I can see Serial numbers in ERP production order but knot for E1AFSER is not sent from ERP to ME. I don't want...

View Article


How the CIR are consumed by the sales order ?

Dear All;I'm currently testing the  strategy 40 (MTS) and I am at the level of planned independent requirements (MD61) and customer requirements (MD81). I created PIR (Type VSF),  CIR (Type KSV) and a...

View Article

Split Batch in accordance to Quantity and Characteristic Value

Dear ExpertsWe need your guidance on a scenario Incoming raw material (ABC-1000) is Batch managed.The Batch Characteristics area) Shelf Life ---(Date)b) Supplier Origin Location ---(Country) For the...

View Article

Create PrdOrd with ref to PldOrd

Hi~     I am using ‘BAPI_PRODORD_CREATE_FROM_PLORD’ to create production order with reference to plan order,     But, we may get several routing group for one material     and in this bapi there is no...

View Article


mass printing printer pop-ups

When I mass print in either COPI or COHVPI I get a printer pop-up for each process order I am trying to print.  How can I avoid this?

View Article

I’m not getting an expedite message on MD04 on this contract that is...

Hi experts can any one let me know what is expedite msg.? i am having this issue with above given info. i have checked the setting it is as usual. i am not getting that where the exact problem is....

View Article

Unit of issue process in Warehouse Mgmt 1

Dear SAP Guru's I have a problem related with alternative unit of measure.Let's get direct to the topic. Cases: i have a part. Let's says Part No: ABC123.Desc: 10 x plastic Bla blaBUOM: PC If we bought...

View Article


Oldest Planned independent requirements to be consumed

  Hi,We have materials using group strategy 40 or 63 in Planning tab MRP2view,the consumption mode = 2 Backward/forward consumptionwith also a consumption horizon for bwd and fwd.we create PIR like by...

View Article


How to seamlessly integrate Repetative manufacturing & PPPI in this scenario?

Hi Experts, The industry is Synthetic yarn/Fiber having various operations like spinning, drawtwist, weaving, winding, rewinding etc. We can go for Process order with the various operations mentioned....

View Article

Extract of CM01 Output data

Hi, My Requirement is to store CM01 report output to application server in excel format at 15 min interval. There is no manual interpretation in this process.I tried to execute SAP standard report...

View Article

Image may be NSFW.
Clik here to view.

Report of Schedule line agreement

Dear all, This is a report of schedule line agreement. And the problem is as follows. After running MRP schedule released for components, Schedule quantities are not being distributed through out month...

View Article

Image may be NSFW.
Clik here to view.

Change of Routing using CA02

Hi PP Experts, I have to do mass change in routing. We have written BDC for the same by calling Transaction Code:CA02. I have to change the time for machine hours and labour hours in routing (Not rate...

View Article


How to restrict BOM explosion for a particular production order type ?

Hi SAP Gurus,  My client requires to restrict BOM explosion during creation of a particular production order type. Though i have controlled routing in OPL8 but unable to restrict BOM explosion. Pls...

View Article

Strategy 60 don't reduce the Ind Req.

Dear Gurusi need to implementation planning strategy 60 for my customer.  I have execute the following steps: 1) Create Material planning with strategy 60 with reduce period anche MRP dual = 3 2)...

View Article


MRP from sales order

Hi, If we create a sale order in a plant and run the MRP then system create the planned order then we convert it to production order then confirmation and stock come in customer order stock. This stock...

View Article

MRP Run

Hi, In order to run MRP successfully we want to close all the open Sales order, PO, open Production order, PO, PR. on monthly basis. We run the MRP based on the sales order.So is there any provision...

View Article


Scope of Check Enhancement in ATP Check for Planned Orders ?

Dear seniors,  I am looking for a way to Enhance the Scope of check in our ATP Check for Planned Order Process. We want to implement a logic for considering demand elements (Order Reservations) for...

View Article

I am getting an error "Sequence 0 operation not found in order XXXX, check...

     Dear All SAP Gurus, I am getting an error "Sequence 0 operation  not found in order XXXXX, check entry" when doing the confirmation of the production order using with BAPI...

View Article

SOP : FLEXIBLE PLANNING

Hi, I working with FLEXIBLE PLANNING for the first time and i'm supposed to follow the below steps in sequence.Steps: 1) Create Info structure MC21 : I copied from an existing Info structure S621 and...

View Article