Serial number issue-Production order release-PPRL
Hi experts, The serial number issue is seems to be very strange.Number range has been maintained only for equipment category " S".Equipment number range interval : From number : 000000000000000001 to...
View ArticleMRP not happening through MD01 but executed through MD02
Hi All,I am working for a project of IS-Retail with manufacturing. Manufacturing plants are created as sites. When I am planning for all the articles in a site through MD01, MRP planning is not...
View ArticleDependent requirement only if superior assembly is dispatched to line
I have a peculiar requirement.. To keep it simple I have a FG and a component under it. component is procured by schedule lines from vendor.. usual process is when you have PIR for FG, you have planned...
View ArticleDependent goods movement was incorrect for collective order
Hello PP Experts,I was testing collective order scenario with the help of this linkhttp://scn.sap.com/docs/DOC-39167While doing confirmation for child orders in CO11N i am getting this errorPlease help...
View ArticleRelease date issue in PR without Material
Hi, In our client system we are facing an issue as follows:- We have created a PM order and we have given an operation outside(PMEX - External Process Control Key) - we would say external service...
View ArticleQuality inspection status to be changed
Hello All, I am facing one problem. Could you please able to clarify my doubt? We are doing production booking and then auto GI,GR thru CORK. After confirmation order quantity will be transferring...
View ArticleMD04 Screen - Available quantity field greyed out
Hi, DEVELOPMENT SERVER: In MD04 screen, I am getting blank screen for a finished product. I have stock for this material in MMBE QUALITY SERVER: In MD04 screen, I am getting 0 in available qty...
View ArticleHow to update the production order long text through ABAP while creating...
Hello All,At time of creation of the production order, the Project long text need to be appended to the production order long text (even if we not enter any long text for production order, the text...
View ArticlePRT and MRP
Dear Gurus, Is there any way to generate planned orders, through MRP, for PRT ? For example : A production order is created, with an operation that need 40 quantities of a PRT (Procured externally,...
View ArticleGoods Receipt production order only with Serial Number that filled in...
Hi, I use serial number for production, and do some configuration that serial number is mandatory before order is released. When i do goods receipt, the serial number is proposed as filled in...
View ArticleBatch Split Incorrectly?
I have a problem with Batch Split. Current inventory for raw material A: BatchQuantity000000000120 KG000000000230 KG An order that requires 40 KG of material A was created and released.Under normal...
View ArticleProcess to split production order based on the raw material batches
Hi All, below is a business situation which needs some some SAP process to help overcoming this issue. We are working on process industry, where the core fabric (SFG) are produced from different...
View ArticleMRP duplicates planned orders
Hi gurus I have this scenario in MD04. As shown MRP generated multiple planned orders:Can anybody help me to understand why? I already excluded MRP launch parameters.Can HANA optimization influence...
View ArticleOne material not in production order component list
Hi PP experts, I created a production order, but there is a material not in component list. The BOM is a SO BOM. I have checked this material valid date in BOM, it is OK. Could you please advise me...
View ArticleHow to seamlessly integrate Repetative manufacturing & PPPI in this scenario?
Hi Experts, The industry is Synthetic yarn/Fiber having various operations like spinning, drawtwist, weaving, winding, rewinding etc. We can go for Process order with the various operations mentioned....
View ArticleMRP Calendar
Hello experts, Which calendar does the MRP uses to calculate dates? Is there any user transaction where it can be seen? Thanks.
View ArticleUser exit for confirmation
Hi Gurus , We have few sales order & for which there is enough stock is available in system but sales order are not being confirmed by the system in current date .It is giving us future date ....
View ArticleMaterial Assignment in Routing
Hello Team ,I need your help .In my business scenario , we will create routing first because that time we don't know about BOM which is required to produce the finished product .Once BOM is created...
View ArticleMS04 order tree can't show follow-up material correctly
Dear all, When I check MS04 result, I find that it can't show the plan order which includes follow-up material correctly, could someone tell me why? Thanks! MS04, cursor on the plan order, then...
View ArticleWeighting groups forecast
Hi,I don't understand how the system divides the weighting groups. How many months (for example) does the number 1(2,3,4) considers? In other words I'd like to know where I could define or discover for...
View Article