Quantcast
Channel: SCN : All Content - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 1791 articles
Browse latest View live

Functional Module for CS15

Hi Can any one let me know the Functional Module used for Transaction CS15 (WHERE USED LIST) because i have requirement of the same output of the CS15 with EXTEND VIEW of MULTI-LEVEL check for the...

View Article


Stop confirmation in ECC when stock of component in EWM s.loc does not exist

Hi All, I have maintained necessary settings in the production order confirmation paratmeters to stop the confirmation incase of any errors. But even after that, when the S.loc is EWM managed system is...

View Article


System Not update quantity in stock please help.

hi, I was trying to do MIGO but system giving error massage" the quantity update has not been update for material type for sp. Plant"Please help me out.  Thanks in advance RegardsChetan Dahiwal

View Article

Error Version of material is invalid

Hi. Please help.We received error "version 1 is invalid for material XXXXXXX on plant PPPP"when checked in MM03, MRP4 tab, production version , version 1 validity is from 9/19/2014 to 02/01/2016 and...

View Article

Strategy 20 Pure make to order

Hi, We are using strategy 20 pure make to order and after MRP run planned order is generated. But can we convert partial qty of planned order to purchase requisition and it balance qty to production...

View Article


Subcontracting MTO

Hi, After MRP run we wish to convert planned order to purchase requistion and then convert this PR to subcontracting PO. But by strategy 20 can the sales order reference will be available in PR and...

View Article

REM- Production line info in Material document

Under REM we use MFBF to do the backflush. It creates a material document when GR and GI is posted.Is there a way we can see   which  "Production line" was used in MFBF from  the material document.

View Article

Assembly Scrap Controlling in CO15.

Hi, I have a production order for a MATERIAL X whose Total Qty is 110 pcs includes 10 % i.e., 10 pcs as Planned Scrap. Requirement : We use Order Confirmation via CO15. Here my planned yield for this...

View Article


Automatic Batch determination

Dear all, I am facing a problem while releasing production order. Batches of components are not being determined automatically when Production order is released. MRP 2 of Material master setting for...

View Article


Routing profile

Hi I have created a few routing profiles. But I can't find how to set it to a specific user or plant etc. Is there any parameter for that? Making a search in the forum without much success yet... milk

View Article

Scheduling a CNF order

Is there a way to dispatch an operation, forward scheduling the order from that point when I have a "CNF in the system status of a previous operation or sequence?

View Article

Automatic creation of Planned Order

Dear experts, I have a problem i want to discuss with you.Supposing that we have a finished product A that uses a semis finished product B.Is there a possibility in SAP to generate automatically a...

View Article

IDOC-EDI Proces

Hi SAP Guru , I am new to the Data Migration process from Legacy System( AS/400) to SAP System . How to create IDOC-EDI process . Please help .  Thanking YouGanesh Chandra BiswalChenai .

View Article


Link between UD & Batch Recording (COEBR)

Gurus,I have a conceptual question here. I was going through a BPD on pharma production processes where the flow of the steps are: - Carry out stock posting through QA11 (but no UD) after production...

View Article

EDI-IDOC Process

Dear SAP Guru , there is a requirement for Data Migration from Legacy system to SAP .  how EDI-IDOC Process works on this migration .   ThanksGaneshChennai .

View Article


Planned scrap in production orders

Hello all, I am a new user and would much appreciate your support! I am very confused by the way that SAP calculates the committed quantity for a production order. In my BoM I have 3 items which are...

View Article

Image may be NSFW.
Clik here to view.

Follow-on functions for production order

Dear experts, In HUM discrete production, I am using TCODE COP1 to plan end product HUs. In the menu bar, I can see that there are two "follow-on functions": "Order confirmation" & "Goods receipt...

View Article


Image may be NSFW.
Clik here to view.

Issue in Start / Finish Timings of operations in Planned Order in Item with...

Dear Friends    We have a Finished goods item with two operations being processed at two different work centers. The routing timings shown are as below ie the second operation will commence only after...

View Article

Image may be NSFW.
Clik here to view.

Material Requirement Planning not reading BOM quantity.

Hello All, This is regarding Material Requirement Planning(MRP).  Strategy - 20 Make-to-OrderMRP has been run for the material ECE001AS0034501 for two different sales orders.  I have run MRP for two...

View Article

Image may be NSFW.
Clik here to view.

Production order - Availability check

Dear All, I need help to solve the issue regarding Availability check for material components. As shown below So many batches are available for the material in both storage locations, and there are no...

View Article
Browsing all 1791 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>