Wrong Delivery Date of Schedule Line after MRP
Hi Expertz, We are facing an issue in client system that system calculates the wrong delivery date for schedule lines after MRP Run. Lets take an example, Product A(Header material), Product...
View ArticleProduction order creation
Dear all, Please is it possible to trigger production by goods receipt. The need is as following : I'm looking for a way to create production order (or planned order) automatically after performing...
View ArticleNot able to close the production order
Hi Team,when we are trying to close the production order we are not able to do so thatand instead of that we are ending with the below error message. please guide mein closing the production...
View ArticleReverse Production Order
I have a production order that has gone through the following transactions: 1. Creation of order (CO01)2. Release of order (CO02)3. Goods Issue (MIGO)4. Goods Receipt (MIGO)5. Confirmation (CO11)6....
View ArticleWeekly forcast
HI Guru's, there is a requirement for Weekly PO generating to Vendors f. We have to enter the Forecast in SAP as weekly such that it will throw weekly PRs for the release to POs. At present we are...
View ArticleGet the Details of BATCH classification data In MASS
Hello Guys , I'm looking for a way to run a report / download from a table the batch classification data for a list of batches in a single go. Now iam downloading single batch at a time from MSC3N...
View ArticleBatch Search with Stock
Hi Guru's, I am having two batch's B-1 and B-2 with qty. B-1=100 reserved for one Process Order-001 and B-2=500 reserved for Process Order-2 but available qty. for B-2=1000.Issue i am during release of...
View ArticlePlanning file is not gettig update
Hi Team,After doing delivery against the sales order with the movement type 601, our user expecting the planning file entryhas to get update. But as per the standard SAP whether it is possible or not...
View ArticleAfter PO cancellation want to clear the labor hour against that production...
Hi experts,I have reversed a production order (600002159 in the picture) but the actual labor hour cancellation was not took place at the time of cancellation. So now I want to clear the actual labor...
View ArticleProduction order printout not in sequence of production number instead print...
Hello PP Experts , On Unicode upgrade we are receiving issue related to Production order printout not following the sequence of production number instead its printing according to sequence of...
View Articledaily requirement MD02
Hi gurus,can someone show me how to have a daily requirement in MD02 .I create Planned Order in MD11 , run MD02 , but i have one order planed for all the requirement.
View ArticleBy product is not reversed on cancelling the GI in PI sheet
Hi All, I have a scenario where we have a logic in pi sheet that on cancellation or partial reversal of GI of component material, reversal of byproduct is done. In one particular case, even after...
View ArticleMaximum number for components for BOM
Dear All, In standard BOM, we can input maximum of 999 components as the increment of item number is by 10. My requirement is, we have more than 1000 components to be added to the BOM. what is the...
View ArticleECC-Planning strategy -60 planning with planning material.
I have a "Planning material" and using the same in say 4 different parent materials. (i.e) Parent material 1,2,3 and 4 use the same planning material say PLMAT. How can I distribute the Demand given...
View ArticleOutput Quantity (101) should not be greater than Input Quantity (261)
Hello all, There is issue related to confirmation. I want to activate lock at the time of order confirmation qty and manually GR qty. For some materials, I need to do GI & GR manually. When I...
View ArticleHow to greyout the field Production relevant in T code CS02
How to grey out the field Production relevant in T code CS02 for particular user alone.Please anyone help me, whether it is Basis issue or some other module issue.
View ArticleAutomatic updation of BOM in Production order
Hi Experts, I have runned MRP on 01.12.2015 and planned order is created on the same day. I have changed the production BOM on 10.12.2015.I have converted the planned order which is generated on...
View ArticleRCSBI010 and Customer header fields
Hello experts! Using PCSD0003, we have enhance our BOM header adding some additional fields in the header SAPLCSDI 1100 is correctly created. Now, to fill all these inforamtion, we want to use a direct...
View ArticleExclude Batch Stocks with Quantity Less 1 than for MRP Calculation
Dear Techies, Good Day!!! We have a requirement where we should not consider Quantity less than 1 or in other words quantities in Fraction. (Example:We have two batches for the Material. First Batch...
View ArticleChange Management for selective set of material
Hi Experts, We have a request form customer to check if Change Management can be activated only for a specific set of materials [for specific line of business] under the same plant and rest of the...
View Article