Wrong Delivery Date of Schedule Line after MRP

Hi Expertz, We are facing an issue in client system that system calculates the wrong delivery date for schedule lines after MRP Run.  Lets take an example, Product A(Header material), Product...

View Article


Production order creation

Dear all, Please is it possible to trigger production by goods receipt. The need is as following : I'm looking for a way to create production order (or planned order) automatically after performing...

View Article


Image may be NSFW.
Clik here to view.

Not able to close the production order

Hi Team,when we are trying to close the production order we are not able to do so thatand instead of that we are ending with the below error message. please guide mein closing the production...

View Article

Reverse Production Order

I have a production order that has gone through the following transactions: 1. Creation of order (CO01)2. Release of order (CO02)3. Goods Issue (MIGO)4. Goods Receipt (MIGO)5. Confirmation (CO11)6....

View Article

Weekly forcast

HI Guru's, there is a requirement for Weekly PO generating to Vendors f. We have to enter the Forecast in SAP as weekly such that it will throw weekly PRs for the release to POs. At present we are...

View Article


Image may be NSFW.
Clik here to view.

Get the Details of BATCH classification data In MASS

Hello Guys , I'm looking for a way  to run a report / download from a table the batch classification data for a list of batches in a single go. Now iam downloading single batch at a time from MSC3N...

View Article

Batch Search with Stock

Hi Guru's, I am having two batch's B-1 and B-2 with qty. B-1=100 reserved for one Process Order-001 and B-2=500 reserved for Process Order-2 but available qty. for B-2=1000.Issue i am during release of...

View Article

Planning file is not gettig update

Hi Team,After doing delivery against the sales order with the movement type 601, our user expecting the planning file entryhas to get update. But as per the standard SAP whether it is possible or not...

View Article


Image may be NSFW.
Clik here to view.

After PO cancellation want to clear the labor hour against that production...

Hi experts,I have reversed a production order (600002159 in the picture) but the actual labor hour cancellation was not took place at the time of cancellation. So now I want to clear the actual labor...

View Article


Production order printout not in sequence of production number instead print...

Hello PP Experts ,  On Unicode upgrade we are receiving issue related to Production order printout not following the sequence of production number  instead its printing according to sequence of...

View Article

daily requirement MD02

Hi gurus,can someone show me how to have a daily requirement in MD02 .I create Planned Order in MD11 , run MD02 , but i have one order planed for all the requirement.

View Article

By product is not reversed on cancelling the GI in PI sheet

Hi All, I have a scenario where we have a logic in pi sheet that on cancellation or partial reversal of GI of component material, reversal of byproduct is done. In one particular case, even after...

View Article

Maximum number for components for BOM

Dear All, In standard BOM, we can input maximum of 999 components as the increment of item number is by 10. My requirement is, we have more than 1000 components to be added to the BOM. what is the...

View Article


ECC-Planning strategy -60 planning with planning material.

I have a "Planning material" and using the same in  say 4 different parent materials. (i.e) Parent material 1,2,3 and 4 use the same planning material say PLMAT. How can I distribute the Demand given...

View Article

Output Quantity (101) should not be greater than Input Quantity (261)

Hello all, There is issue related to confirmation. I want to activate lock at the time of order  confirmation qty and manually GR qty. For some materials, I need to do GI & GR manually. When I...

View Article


How to greyout the field Production relevant in T code CS02

How to grey out the field Production relevant in T code CS02 for particular user alone.Please anyone help me, whether it is Basis issue or some other module issue.

View Article

Automatic updation of BOM in Production order

Hi Experts, I have runned MRP on 01.12.2015 and planned order is created on the same day. I have changed the production BOM on 10.12.2015.I have converted the planned order which is generated on...

View Article


RCSBI010 and Customer header fields

Hello experts! Using PCSD0003, we have enhance our BOM header adding some additional fields in the header SAPLCSDI 1100 is correctly created. Now, to fill all these inforamtion, we want to use a direct...

View Article

Exclude Batch Stocks with Quantity Less 1 than for MRP Calculation

Dear Techies, Good Day!!! We have a requirement where we should not consider Quantity less than 1 or in other words quantities in Fraction. (Example:We have two batches for the Material. First Batch...

View Article

Change Management for selective set of material

Hi Experts, We have a request form customer to check if Change Management can be activated only for a specific set of materials [for specific line of business] under the same plant and rest of the...

View Article