Quantcast
Channel: SCN : All Content - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 1791 articles
Browse latest View live

Production order Printout for multiple layouts

All,  I have researched the forum but want to ensure if this settings would work for me. I have 5 MRP controllers who print their own production orders. All the 5 MRP controllers have their own...

View Article


Scheduled dates In Process Order

Hi, The scheduled dates in the process orders are not calculated despite the formulas are mantained at the work center. I've noticed that in the General data at the process order, the system indicates...

View Article


Image may be NSFW.
Clik here to view.

Production in other plant

Hi, My requirements are the following:- We have two FI societies: 3401 and 3402.- Each society has on Plant: 3401 - 3401 and 3402 - 3402.- Plant 3401 receives the sales orders and Plant 3401 produces...

View Article

Error during alternate UOM creation

Dear All, Please refer the below error. The unit of measure WF consists of more than 99999 base units of measure Message no. MM117 Diagnosis Each alternative unit of measure must not exceed 99999 base...

View Article

2 Production Order in MD4C

Dear all I have a doubt about the displayed elements when we run report in MD4C. We have a Sales Order of 500 ST and we need to split the requierement in two different production order of 250 ST. The...

View Article


PP02 Control Key Behavior

Hi Group,At my company we are interfacing ECC production orders with ME shop orders. In our routing operations for these production orders we have defined control key PP02, as prescribed by SAP. When...

View Article

Image may be NSFW.
Clik here to view.

cs15 alternative bom field is coming as blank

Hi,   in report cs15 alternative bom field is coming as blank.kindly help why this field is coming as blank.   Thanks & Regards Sandeep Kumar Praharaj

View Article

trigger point in routing

Hi all, I am new to trigger points. What is the use of trigger point ? and how the trigger point is useful in production side ? I have gone thru the similar scn document for trigger points but still i...

View Article


Alternative unit of measure at operational level is creating problem in CO11N

Hi Sapients,  Had created combined order A  with order quantity 21.3 kg with original orders B,C&D with the order quantity 7.1,7.1 & 7.1 kg. This combined order has 06 operations. For every...

View Article


Impact when Selecting Incorrect Process Order Type

Dear Expert,Our scenario is the following:Material 1 linked to Prod. Sched. Profile 1 and Order type 1. Material 2 linked to Prod Sched. Profile 2 and Order  type 2.  (no good receipts for this order...

View Article

UOm not rounding up to 1 after implement of OSS note 359621

Hi Friends, I need help on one issue. I had issue of rounding the fraction qty of component during GI-261 movt type. I mean when for Production order I issue the quantity for component with discrete...

View Article

Image may be NSFW.
Clik here to view.

Procurement type - X

Hi Gurus,  I have maintained the procurement type X for a material xxx.  I run MRP with Create purchase requisition mode as 1 (ie Purchase requisition). but planned order is created in MD04 .   Is it...

View Article

Image may be NSFW.
Clik here to view.

Delivered field qty issue in production order general tab against MB51 and MD04

Hi,I am facing one issue in production order delevered field in general tab is showing the qty as 7.590 out of total qty 11. 000 But in mb51 the material Documents for 101 movements is showing for...

View Article


GI and GR needs same batch number

Hi All, in my project I am having one SFG & one FG. After SFG manufacturing, same is moving for packaging and again we are creating a new PO for FG material. My requirement is to derive SFG batch...

View Article

creating production order scheduling dates are not calculated exactly

Dear All,   Creating production Order Scheduling dates are not calculated exactly in discrete manufacturing as well as process industry scenario       Please, give a solution.     Thanks. Best...

View Article


How we can change the Effective parameter

Hi Gurus, How we can change the effective parameters of a standard variant (linked to ECM)  for  a existing production order which status is REL. Also I have a query how the standard variant is linked...

View Article

Routing Operation Counter is Same For all operations.

Hi.I need Your suggestions,Through the Bap :: BAPI_ROUTING_CREATE'  I am Creating the Routing Operations, Exactly What we are doing At Ca01.But the problem is. Please Have a look On Below Attached...

View Article


Production Order affect in changing the BOM?

Hi Friends,Good Day...1. If i created a Production Order on 01-Feb-2015, whatever the BOM having the parent assy is as it is and in 03-Feb-2015 if i change an BOM in parent assy what will be the effect...

View Article

HAVING ISSUE WITH WRONGLY MADE PROCESS ORDER TYPE

I am facing issue with a process order 1833570 as this process order was made mistakenly with type ZPIM instead OF ZPI2. So what happen - after giving pallet transfer ,shipping confirm it but it became...

View Article

Production Process for Subcontracting Service

Hi Please Help me to find a solution for the below scenario. Client has two Company codes . both company codes manufacture customized adhesive  tapes.  1. company "A" subcontract semi-finished...

View Article
Browsing all 1791 articles
Browse latest View live