End Month financial closure period very long
Hi all !In 2012 in customer site, i had issue regarding the end month financial closure period. The last friday of the month in the evening, before leaving the office , the financial team used to run...
View ArticleReserved batch consumption
Hi All,I have a case that batch of a component is reserved for order and the order is released. goods issue not yet performed.When I tried to do the goods issue found the material was not in stock. On...
View ArticleOrder scheduling in MTO scenario
Hello Expert, Scheduling date of PO in MTO I have raised above points regarding scheduling issue of Order in case MTO, I closed an issue because I wanted to spend sometime in testing before I raise any...
View ArticleLTP planned order to be created with different order type
Hi All, I need your suggestions to differentiate the simulation planned order and the operative planned order. At this moment the simulation order type is same as the operative order type after running...
View ArticleCS12 Currency Overflow DUMP
Dear SAP Gurus, Good afternoon, please I need your help to solve the following issue when I try to run CS12 TCODE. Problem Description: I have a BOM with one item.The cost of item is too expensive.The...
View ArticleWIP Batch - WIP To GR Process
Hello, I have 3 step production operation and at the end of each operation, I create a WIP batch. At the end of the 3rd operation, I am trying to link my WIP (at the top most level) to the GR batch to...
View ArticleMFBF
Dear Friends, I have done the MFBF on 04.03.2016 with 350 qt. Now they want to reversal the document on 31.03.2016. When i was tried with MF41 on 31.03.2014 sysytem reverse the document. But when i...
View ArticleMass Master Recipe Generate Relationship (For Phases)
Dear All, I have created a BDC for the Mass Master recipe upload, Generate relationship...
View ArticleHow to post the current stock into previous month stock in MFBF screen
Dear All Please can any one suggest how to post the current stock inventory into previous month material document through MFBF Backflush
View ArticlePlanning Calendar
Hi, In MD04 under period total view, when i clicked on Planning Calendar tab, got the following error, "Error determining planning periods for calendar 001 - Message no. 61123" Actually to this plant...
View ArticleIn Ready Mix Concrete plant finished material will be produced on basis of...
Dear SCN's, We have Ready mix concrete plant where we produce ready mix concrete as finished product. We produce material on basis of Sales order for external sales and Purchase order for internal...
View ArticleHow we can change the Effective parameter
Hi Gurus, How we can change the effective parameters of a standard variant (linked to ECM) for a existing production order which status is REL. Also I have a query how the standard variant is linked...
View ArticleSAP PP-PI IN HOT ROLLING MILL
Hello allI am working in a hot rolling mill since 5 years.We produce Hot rolled coils.Now we are planning to implement the PP module.As per my understanding SAP PP-PI should be implemented.We have a...
View ArticleZero records converted in RMCA9155
Hi Experts,I am trying to execute program RMCA9155 for MPS process, to Copy and Delete version 000 to a Week Source info structure S901Source version 000 Target info...
View ArticleTesting of "Availability Check Control" OPJJ
Hi, Our client asked us to is remove the checkmark for “Incl. Dependent Requirements” in configuration of "Availability Check Control" OPJJ( Availability Check +Checking Rule), I had removed the...
View ArticleCS12 Currency Overflow DUMP
Dear SAP Gurus, Good afternoon, please I need your help to solve the following issue when I try to run CS12 TCODE. Problem Description: I have a BOM with one item.The cost of item is too expensive.The...
View ArticleSome parts in the BOM are not updating/showing in costing structure BOM...
Hi, Some parts in the BOM are not updating/showing in costing structure BOM eventhough after its ran for costing BOM, please suggest me what i'm missing? Regards,Santhosh.
View ArticleProduction Order Scheduling Basic start date in the past
Hi,I have an issue in scheduling the production order in the forward scheduling. the scenario is like this:I am trying to forward schedule the production order starting from today. But when the...
View Articlestock requirement list/quantity discrepancy
Hi All, I am facing one issue in stock requirement list.The schedule line quantity for a component material(ROH) is greater than the demand of dependent material(HALB) and that schedule line is...
View ArticleSplit has not been assigned (CM25)
Hello,In CM25 using Profile SAPCFGC005...Order dispatch successfully, But Splits has not been dispatched,PFA screen shot for my issue Its very Urgent, any one help me with procedure,am doing click...
View Article