Quantcast
Channel: SCN : All Content - SAP ERP Manufacturing - Production Planning (SAP PP)
Browsing all 1791 articles
Browse latest View live

Production order issue

Hi Experts, I am not able carry out MIGO after a change in the material master. In production order, while trying to do read pp master data -system giving error "system status PCNF is active" Please...

View Article


PP Notification with HR Validation

Hello. My client request is to know who person it is working in which process order. In order to answer this request, I already did the following in SAP  a) Create a resource type 008 in transaction...

View Article


Semi-Finished triggers Finished good planning

Hi,I'm using strategy 70 to use PIRs and start the planning of a semifinished good.Is there a way to trigger the planning of the finished good regarding what's have been planned for the semi-finished?...

View Article

MFS0

Hello, We have repetitive manufacturing and I have two work centers, but only one of them allow me edit the data in the transaction MFS0 and we need edit in both work centers. Can anyone help me to...

View Article

MRP: Vendor is not selected and general problems on source determination

Problems on the source determination are very common on material requirements planning. Generally, a vendor or scheduling agreement is defined on the source list, however, when MRP is executed, this...

View Article


SAPBPS00 vs SAPLPS00 (LAS1 vs LAS2)

We have successfully tested and setup LAS2 for Takt Time Scheduling. We are now attempting to automate with the same parameters in LAS1. When punching in the parameters the same way as LAS2 - we get...

View Article

MF60 not pulling up the materials

Hi I ensured all the config necessary for the MF60 pull list but still the component materials not coming up in the pull list. This is for the repetitive manuf scenario, FG = rep-01 has one sfg...

View Article

Image may be NSFW.
Clik here to view.

Variant Configuration worOrder Splitting with different sales order

Dears,  My customer is working with Variant Configuration, I have activated Business function LOG_PP_PROD_ORD_SPLIT in order to be able to do order splitting with MTO.  In our case we need to create...

View Article


BAPI_PRODORDCONF_CREATE_TT COGI error

Hi experts, we are using BAPI_PRODORDCONF_CREATE_TT for order confirmations.In some cases(Batch does not exist etc.), a few records go to COGI, but the actual confirmation gets posted.Now our...

View Article


Simultaneous production orders (discrete manufacturing)

Hi everybody, I have internally manufactured products A and B. Product B is used on the BOM of A.I need to plan the production order of B and A to be produced simultaneously.Anybody has any idea to...

View Article

MTO+MTS strategy without sale order reference

Hi All, I need two customized strategy . How can I map following scenario . Kindly guide me.  A MaterialStock= 50PIR= 100Sale Order=100Need collective planned order without reference of sale order...

View Article

Kanban Production order confirmation with Barcode signal

Hi friends, We are having requirement to confirm production order through Barcode scanner signal to SAP 1. We have configured the KANBAN process in the following way     a. Upon empty the BIN, system...

View Article

MRP Elements in MD07

Hi, As we know MD04/MD07 - Stock Requirement List is common transaction code for PP, MM, SD, QM modules and it has various functionalities. There are list of MRP elements from different modules like...

View Article


Using COOIS to follow our production

Hello,This is my first time here. Today, we're using barcodes on our fabrication order to manage our stocks. I'd like to use these validations through the COOIS to be able to follow every product along...

View Article

Image may be NSFW.
Clik here to view.

data transfer between 2 PI sheets of same process order

Issue- Need to transfer data of repeated data request from PI sheet of one operation to PI sheet of another operation. we have 2 PI sheets generated for 2 different terminals on shop floor.  Need to...

View Article


MD04 requirement getting disappeared

Hi,  I am facing a strange behavior in MD04, where the requirement list is getting disappeared for a sales order. The scenario is - There are 2 sales orders created for a same material. When the...

View Article

CANNOT Delete Process Order

Hi, I achieved the deletion for several process orders but i cannot delete a cuple of them.I'm able to change the order status to DLFL (COR2) but when I try to set the Delete status (COR2) the system...

View Article


Image may be NSFW.
Clik here to view.

Collective MS04 list

Dear all,  I need to create a collective MS07 list, similar to the collective MD04 list made by Mariano Cabalen (Custom Report: MD07 Collective Access with Multiple Selections). I found in Internet the...

View Article

Image may be NSFW.
Clik here to view.

SAP Flexible planning issue

Hello Team,  Please help us to understand the below issue  Material Actual order qty in MC95 and Info Structure Table(S911) qty not match with cumulative Sales order qty in table.  Please check the...

View Article

PIR consumption - Planning Stragegy added after sales orders were created

Good day to all. We added the planning strategy after sales orders were entered.  We then added planned independent requirements (PIRs).  The old sales orders do not consume the PIRs.  Field VPZUO...

View Article
Browsing all 1791 articles
Browse latest View live


<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>