Control of the finished product release based on the component
Hello Gurus, How to control use of one material/component in multiple codes, e.g. material /component is released for one code, but what will stop usage in other codes for which it has not been...
View ArticleReg exception display 10 and 15
All,Following corrections referred in thread 3803848.Tolerance value updated as belowTolerance value forward : 0Tolerance value displacement :2Upon changes ,exception display for scheduled receipts...
View ArticleMRP Exception message
Hi Gurus,In MRP Exception Message Groups and sub groups , How to check whether it is Inbound or not and How to add buffer days to clear the message. Pls help me to do so.. Thanks in advance...
View Articleload / requirement not display in new hierarchy
Hi we have created a new hierarchy: but when we run CM01 to display the load / capacity , the load is not display the load is display for the hierarchy earlier in the past ..but since several weeks...
View ArticleLSMW for change bom issue
Dear Expert : when using direct input method for updating bom I have this issue: the update I want to do is adding a material to some bom, when i create the lsmw , every thing is fine , when...
View ArticleCS12 - Component marked as assembly does not explode (in CS13, the component...
I have a material with 4 components, only the 4th component has sub-assemblies/sub-components. When I look into transaction CS03 this is what I see... 0010 Comp10020 Comp20030 Comp30040...
View ArticleMRP Scenario issue with strategy type
Hi Experts, Currently I am using MTO scenario and all PR is generating against particular sales order. If i convert PR to PO sales order link continuesIf i go GRN for PO same sales order link continues...
View ArticleProduction based on customer raw materials
Hi, We have two inter company set up as A and B (sister companies). Company A perform subcontracting for company B who provides all raw materials to Company A. Company A charge a service fee from...
View ArticleHow to make alternative Bom to default Bom for MRP Run
Dear Support team, I have 5000 Materials having 2-3 alternative bom's, I want to change that 2 or 3 alternative Bom's to default bom for MRP run,currently I selecting manually everyday 2nd...
View ArticlePrevent saving User view of MD04 after CALL TRANSACTION 'MD04'
Hello, i am USING CALL TRANSACTION 'MD04' in a Report.Somehow md04 acts different from the direct normal start from the SAP GUI.Normally md04 always shows all current requests, planorders s.o.When...
View ArticleUse of function module CS_BOM_EXPL_MAT_V2 to display multilevel BOMs across...
I would like to know if function module CS_BOM_EXPL_MAT_V2 can be used to display the complete BOM structure, including children of materials that have procurement type = F and special procurement =...
View ArticleMRP terminating for one material
Hi, MRP background job working fine without any error messages. But for one material which is having MRP Type V1 getting terminated with message 8 which can see in MRP spool. Please suggest why it is...
View Article101 Mov. Co-products only, not principal product
Hello, Please your help I need to make a Good Receipt movement of a production order, which has a co-products, the problem appears because I need that SAP only shows the coproducts in the MIGO, not...
View ArticleComponent sorting as per Order BOM
Hi Experts, I have sort the Production order on BOM sort, so component has sorted has per level.Please help me to capture as level as BOM sort in production order GR list output. Or, How Tcode- CSKB,...
View ArticleMessage elimination while using CO48 for planned order to production order
Dear All,We use Planned order created through APO/MRP for Production. We use COHV and convert planned order to production order and release it to production supervisors. At this time most of...
View ArticleRead PP master data in Production Order
Dear all,I have a requirement where I want to make "Read PP master data mandatory" before posting Production order so that system reads latest BOM. Then whether the Production order is manual or from...
View ArticleSingle production order for Multiple Sales Order- Order Clubbing
Hi all, At one of our client Plant A is dependent on plant B for raw material. Plant A give manual production plan to Plant B as per their requirement for production at Plant B. But the constraint at...
View ArticleMrp log ..mrp iş not running for some items
Dears When we are running MRP some items are excluded as it is blocked. .is there any reports to see those items excluded in MRP..like log... TxVijesh
View ArticleRange of coverage profile
Hi Gurus We have a requirement wherein the coverage profile has to take the requirements average of only one month, which is the next month. This should be the safety stock to cover 5 days of the...
View ArticleMD06- Error log only for those items which are in planning
Hello, Am looking for error log in MD06 only for those item which are not planned due item status is blocked. for the same , i selected exception group 8 and which is ok but in the log it is showing...
View Article