Enable Tab Engineering change status in VA33
Hello Could you please advise how could we active the tab engineering change status in VA33 ? In some schedule agreements it appear and in others no ? Thanks for your help.
View ArticleMRP terminating for one material
Hi, MRP background job working fine without any error messages. But for one material which is having MRP Type V1 getting terminated with message 8 which can see in MRP spool. Please suggest why it is...
View ArticleBatch Split Incorrectly?
I have a problem with Batch Split. Current inventory for raw material A: BatchQuantity000000000120 KG000000000230 KG An order that requires 40 KG of material A was created and released.Under normal...
View ArticleSAP MRP planning Planned Order Release Elements in Re Order Point
Hello, I am changing from PD MRP type to Re order point with external requirements. When I have a Planned order in a different plant for which I see Planned Order Release in the current plant where I...
View ArticleRounding Profile for Material Staging
To All Is it possible to use a rounding profile for materials used in material staging transaction LP12? Currently it totals production order demands. e.g. Prod Order 1000000Material ARequirement 0.6kg...
View ArticleSAP PP Things to keep in mind when changing from PD to ROP MRP Type
All, I am setting up re order point planning for already existing finished products at my selling plant for the procured items from my MFG plant, and i am thinking about the following items during...
View ArticleBackflush at Line level for planned orders at Machine level
Scenario-Planned Orders: Created 2 orders(1000 cases each) at Machine Level, with Machine 1 at Line 1 and Machine 2 at Line 2. (Note: Both Machines and Lines are created as Production...
View ArticleIssue in PR from Sale order in mrp run
Hi All, I am facing one issue, I have created a Sale order( customer order), and we are running the MRP in background for every 24 hours. my issue is, For the sale order the Purchase request created...
View ArticleProduction order confirmation
Hi friends, It has been observed that during confirmation and while good movement, most of the stock are adjusted. For example, if the BOM has two components, then user sometime add some more component...
View ArticleReg exception display 10 and 15
All,Following corrections referred in thread 3803848.Tolerance value updated as belowTolerance value forward : 0Tolerance value displacement :2Upon changes ,exception display for scheduled receipts...
View ArticleMD04 issue
Dear Experts, we are doing the Production using MTO Scenario (sale order Costing), in the MTO process, Once we do the MRP run in MD02 system will show the list of PR's , PO's to be created, and in...
View ArticleMatetrial types mandate
Hi friends, Can we mandate field in material master in MRP tab for specific material type only.For example : if I have FERT and HALB as a material types and I want to mandate production schedule...
View ArticleHow to mass add operation to routings in CEWB
Hello Guru's Can anyone explain me how I can add an operation to a routing of a material using CEWB. The operations/activity number is fixed (always 320).I have used CEWB limited. I know how to change...
View ArticleMrp log ..mrp iş not running for some items
Dears When we are running MRP some items are excluded as it is blocked. .is there any reports to see those items excluded in MRP..like log... TxVijesh
View ArticleMRP Generating Requisition if date does not meet the demand date
Hi I have an example where I have a demand order and supply order. If the supply date is before the demand requirement date there is no problem. MRP runs and does not create a requisition or planned...
View ArticleChange "Valid To" date of BOM component
Hello friends, I am facing problem in changing "Valid To" date of BOM, i have created ECN for that & did lots search and try but doesn't works.Which date I should put in "Date - Lower limit" and...
View ArticleProblem with reporting from production sub system back to SAP
Hi All, maybe someone can be of help.? to control our Production we are using Cosmino. via EDI we transfer data to and from Cosmino / SAP. Has anyone a set up, where a form or ,mold is used to produce...
View ArticleFinal Issuance indicator on first issuance
Hello, I have a problem with the issuance against process order. 1- I have made issuance against process order but with wrong quantities and checked final issuance tick (System proposed all the...
View ArticleProduction Order Cancellation
Hi Gurus, I have a scenario is like, my production order is been automatically created while sales order is created (due to configuration). At the same point of time we are using a serial number...
View ArticleReduction of planned independent requirements goods receipt for a production...
Hi Gurus, I have a fert that consumes a halb. I would like to put the RIP only HALB, and when making a goods receipt for a production order to consume the RIP of HALB. What strategy should I use? I...