To All
Is it possible to use a rounding profile for materials used in material staging transaction LP12?
Currently it totals production order demands. e.g.
Prod Order 1000000
Material A
Requirement 0.6kg
Prod Order 1000001
Material A
Requirement 0.7kg
So quantity to be staged to the PSA is shown as 1.3kg.
I know I can manually overide the quantity and enter 2 kg and process. However, how can I get LP12 to 'round up' the total quantity so that the screen diplays 2 kg to process instead of manually entering it?
Do I use the Rounding Profile in MRP1?