DOUBT IS IN ALTERNATE BOM RAW MATERIAL CONSUMPTION
SFG1
RM1-MAIN BOM
RM2-ALT BOM
SAP QTY IN PLANT
RM1-30 KG
RM2-100 KG
WHEN IT IS GONE FOR PRODUCTION SFG 1 IT SHOULD CONSUME RAW MATERIAL 40 KG EITHER RM1 OR RM2. BUT IN THIS ALTERNATE BOM, IT IS TAKEN RM2 - 40 KG. 40 KG OF RM2 CONSUMED.
MY DOUBT IS WHY IT IS NOT TAKEN RM1 MATERIAL CONSUMING 30 KG AND THEN RM2 10 KG.
4 NOS SFG IS 40 KGs