Planned delivery time is not taken into consideration when creating PR

$
0
0

Good afternoon.

 

I am running an MTS scenario, where i am using EX as lot size and PD as MRP type. When i run MRP for my material,

MRP creates one Purchase requisition per day (grouping daily reqs, as it is the standard behavior of EX in MTS scenario),

but it does not take into consideration the planned delivery time for the material. In other words, it creates the PR the same

time that the requirements are needed.

 

Although i have searched, i am not sure i have understood why this is happening. One possible solution could be that for this

material's supplier an inforecord exists, with zero (0) as planned delivery time. I know that MRP, in case an inforecord exists,

it reads the planned delivery time from the inforecord, and in this case this time was 0. So, i entered the inforecord and changed it

from 0 to 10 days, but again, no change in PR date. I also went to transaction OPPQ and for the specific plant i unclicked the

"Scheduling/inforecord agreement" from the "External Procurement" option, but again, nothing changed.

 

Is there something i can do, or this is normal behavior of EX lot size type when in MTS scenario?

 

Thank you very much,

Nikos