Quantcast
Channel: SCN : All Content - SAP ERP Manufacturing - Production Planning (SAP PP)
Viewing all articles
Browse latest Browse all 1791

Variant configuration on Routing

$
0
0

Hi Experts.

 

I have a question, I am working on a project where the FG is configurable material and MTO (obviously)

 

I want to make a routing for my FG and I want to over write my first standard value. The new value is based on my Sales order Characteristics. Is it possible to do it using object dependencies?

 

 

Case

Material ABC is configurable material. The Assigned class has 2  characteristics  Diameter and Length.

 

both these parameters are filled while entering the sales order and both of them effects the machine production time (Standard Value 1).

 

 

is it possible to change the routing standard value (machine time) using dependencies based on sales order characteristics Diameter and Length?

 

if yes How?

 

Endif

 

CR


Viewing all articles
Browse latest Browse all 1791

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>